Home › England (NHS England estates) › HTM 03-01 A

HTM 03-01 A: Specialised ventilation for healthcare premises Part A: The concept, design, specification, installation and acceptance testing of healthcare ventilation systems

NHS England · Source file: HTM0301-PartA-accessible-F6.pdf · 213 pages · Snapshot 9 November 2026
Authoritative version: official PDF. This site holds an unofficial text extract split into sections.

Contents

#SectionPDF pages
1_Hlk37000395 – About Health Technical Memoranda (pages 1–8)1–8
2_Hlk37000395 – About Health Technical Memoranda (pages 9–16)9–16
3_Hlk37000395 – The needs of the building occupants / _Hlk37000395 – Airborne risks to staff17–18
4_Hlk37000395 – Specialist equipment environment19–20
5_Hlk37000395 – Surgical procedures / _Hlk37000395 – Medical care21–22
6_Hlk37000395 – Palliative care23–24
7_Hlk37000395 – Health and Safety at Work etc Act / _Hlk37000395 – Workplace (Health, Safety and Welfare) Regulations25–26
8_Hlk37000395 – The Medicines Act 1968 and Human Medicines Regulations 2012 / _Hlk37000395 – Project brief27–29
9_Hlk37000395 – Derogations and alternative design strategies / _Hlk37000395 – Resilience and diversity30–36
10_Hlk37000395 – Refurbishment of existing facilities and fitting out shell schemes / _Hlk37000395 – Computer-aided design (CAD) and building information modelling (BIM)37–47
11_Hlk37000395 – Timed control / _Hlk37000395 – Occupancy control – user triggered48–50
12_Hlk37000395 – Building construction factors51–52
13_Hlk37000395 – User requirements53–54
14_Hlk37000395 – General considerations55–59
15_Hlk37000395 – Operating department60–67
16_Hlk37000395 – Ultra-clean ventilation system68–75
17_Hlk37000395 – Barn and semi-barn theatres / _Hlk37000395 – Hybrid theatres76–77
18_Hlk37000395 – Interventional imaging suites / _Hlk37000395 – Other application-specific design guidance78–84
19_Hlk37000395 – Hydrotherapy: general requirements85–88
20_Hlk37000395 – Plantroom ventilation / _Hlk37000395 – General requirements89–94
21_Hlk37000395 – Supply AHUs and associated extract units (pages 95–102)95–102
22_Hlk37000395 – Supply AHUs and associated extract units (pages 103–110)103–110
23_Hlk37000395 – Supply AHUs and associated extract units (pages 111–112)111–112
24_Hlk37000395 – Distributed air-conditioning elements / _Hlk37000395 – AHUs: automatic control113–118
25_Hlk37000395 – Local exhaust ventilation (LEV)119–121
26_Hlk37000395 – General / _Hlk37000395 – Distribution systems122–124
27_Hlk37000395 – Point of use / _Hlk37000395 – Floor marking125–126
28_Hlk37000395 – General127–129
29_Hlk37000395 – Pre-commissioning checks130–131
30_Hlk37000395 – Dynamic commissioning132–133
31_Hlk37000395 – Specific performance standards134–135
32_Hlk37000395 – Ventilation system commissioning records / _Hlk37000395 – Appointment of validator136–137
33_Hlk37000395 – Design proposal review / _Hlk37000395 – Permeability testing138–143
34_Hlk37000395 – UCV canopy leakage tests / _Hlk37000395 – Vertical flow UCV canopy air velocity tests144–145
35_Hlk37000395 – UCV canopy entrainment test146–149
36_Hlk37000395 – UCV terminal control system checks / _Hlk37000395 – UCV theatre microbiological tests150–152
37_Hlk37000395 – Radiopharmacy aseptic preparation facilities / _Hlk37000395 – Records required153–157
38_Hlk37000395 – Spares / _Hlk37000395 – BIM status158–159
39_Hlk37000395 – Supply AHU with remote extract unit / _Hlk37000395 – Double-stacked supply and extract AHU160–161
40_Hlk37000395 – Cabinet AHU162–169
41_Hlk37000395 – Standard layout 1 – Two-corridor conventional operating suite with “lay-up” prep / _Hlk37000395 – Standard layout 2 – two-corridor UCV operating suite with SPS prep170–171
42_Hlk37000395 – Standard layout 3 – single-corridor conventional operating suite with “lay-up” prep / _Hlk37000395 – Standard layout 4 – single-corridor UCV operating suite with SPS prep172–173
43_Hlk37000395 – Appendix 2: Summary of design conditions163–164
44_Hlk37000395 – Appendix 3: Hierarchy of cleanliness / _Hlk37000395 – Appendix 4: Leakage flows in m3/s through closed door gaps165–166
45_Hlk37000395 – Appendix 5: Recommended airflow rates in m3/s through a doorway between rooms of different cleanliness to control cross-contamination / _Hlk37000395 – Appendix 6: Typical approximate pressures in an operating suite when a given door is open167–168
46_Hlk37000395 – Appendix 7: Operating suite design logic / _Hlk37000395 – 5.0 Ventilation strategies (pages 39–46) / _Hlk37000395 – 5.0 Ventilation strategies (pages 47–54) / _Hlk37000395 – 5.0 Ventilation strategies (pages 55–62) / _Hlk37000395 – 5.0 Ventilation strategies (pages 63–70) / _Hlk37000395 – 5.0 Ventilation strategies (pages 71–78) / _Hlk37000395 – 5.0 Ventilation strategies (pages 79–86) / _Hlk37000395 – 5.0 Ventilation strategies (pages 87–94) / _Hlk37000395 – 5.0 Ventilation strategies (pages 95–102) / _Hlk37000395 – 5.0 Ventilation strategies (pages 103–110) / _Hlk37000395 – 5.0 Ventilation strategies (pages 111–118) / _Hlk37000395 – 5.0 Ventilation strategies (pages 119–126) / _Hlk37000395 – 5.0 Ventilation strategies (pages 127–134) / _Hlk37000395 – 5.0 Ventilation strategies (pages 135–142) / _Hlk37000395 – 5.0 Ventilation strategies (pages 143–150) / _Hlk37000395 – 5.0 Ventilation strategies (pages 151–158) / _Hlk37000395 – 5.0 Ventilation strategies (pages 159–166) / _Hlk37000395 – 5.0 Ventilation strategies (pages 167–173)169–173
47OLE_LINK2174–177
48_Hlk36670561 – General / _Hlk36670561 – Peripheral room type178–179
49_Hlk36670561 – Air-movement control in peripheral rooms180–182
50_Hlk36670561 – Door opening / _Hlk36670561 – Door leakage flows183–184
51_Hlk36670561 – Relief of excess air from operating theatre when all doors are closed (pages 185–192)185–192
52_Hlk36670561 – Relief of excess air from operating theatre when all doors are closed (pages 193–200)193–200
53_Hlk36670561 – General / _Hlk36670561 – Low-level extract installation201–202
54_Hlk36746534 / 1.0 Introduction / 2.0 The user requirements / 3.0 Legal requirements – applicable legislation / 4.0 The design and specification process – Project brief / 4.0 The design and specification process – Derogations and alternative design strategies / 4.0 The design and specification process – Resilience and diversity / 4.0 The design and specification process – Refurbishment of existing facilities and fitting out shell schemes / 4.0 The design and specification process – Computer-aided design (CAD) and building information modelling (BIM) / 4.0 The design and specification process – 5.0 Ventilation strategies / 6.0 Energy control strategies / 7.0 Environmental control / 8.0 Specific healthcare department requirements – General considerations / 8.0 Specific healthcare department requirements – Operating department / 8.0 Specific healthcare department requirements – Ultra-clean ventilation system / 8.0 Specific healthcare department requirements – Barn and semi-barn theatres / 8.0 Specific healthcare department requirements – Hybrid theatres / 8.0 Specific healthcare department requirements – Interventional imaging suites / 8.0 Specific healthcare department requirements – Other application-specific design guidance / 8.0 Specific healthcare department requirements – Hydrotherapy: general requirements / 8.0 Specific healthcare department requirements – Plantroom ventilation / 9.0 Equipment selection factors – General requirements / 9.0 Equipment selection factors – Supply AHUs and associated extract units (pages 95–102) / 9.0 Equipment selection factors – Supply AHUs and associated extract units (pages 103–110) / 9.0 Equipment selection factors – Supply AHUs and associated extract units (pages 111–112) / 9.0 Equipment selection factors – Distributed air-conditioning elements / 9.0 Equipment selection factors – AHUs: automatic control / 9.0 Equipment selection factors – Local exhaust ventilation (LEV) / 10.0 Installation standards / 11.0 Commissioning systems / 12.0 Acceptance testing: validation – Appointment of validator / 12.0 Acceptance testing: validation – Design proposal review / 12.0 Acceptance testing: validation – Permeability testing / 12.0 Acceptance testing: validation – UCV canopy leakage tests / 12.0 Acceptance testing: validation – Vertical flow UCV canopy air velocity tests / 12.0 Acceptance testing: validation – UCV canopy entrainment test / 12.0 Acceptance testing: validation – UCV terminal control system checks / 12.0 Acceptance testing: validation – UCV theatre microbiological tests / 12.0 Acceptance testing: validation – Radiopharmacy aseptic preparation facilities / 13.0 Information / Appendix 1: Typical AHU plant layouts / Appendix 2: Summary of design conditions / Appendix 3: Hierarchy of cleanliness / Appendix 4: Leakage flows in m3/s through closed door gaps / Appendix 5: Recommended airflow rates in m3/s through a doorway between rooms of different cleanliness to control cross-contamination / Appendix 6: Typical approximate pressures in an operating suite when a given door is open / Appendix 7: Operating suite design logic / Appendix 7: Operating suite design logic – Standard layout 1 – Two-corridor conventional operating suite with “lay-up” prep / Appendix 7: Operating suite design logic – Standard layout 2 – two-corridor UCV operating suite with SPS prep / Appendix 7: Operating suite design logic – Standard layout 3 – single-corridor conventional operating suite with “lay-up” prep / Appendix 7: Operating suite design logic – Standard layout 4 – single-corridor UCV operating suite with SPS prep / Appendix 7: Operating suite design logic – Standard layout 5 – (ex HTM 2025 Plan 1b): single-corridor conventional operating suite with “lay-up” prep / Appendix 7: Operating suite design logic – Standard layout 6 – (ex HTM 2025 Plan 1a): single-corridor UCV operating suite with SPS prep / Appendix 7: Operating suite design logic – Standard layout 7 – (ex HTM 2025 Plan 5b): two-corridor conventional operating suite with “lay-up” prep / Appendix 7: Operating suite design logic – Standard layout 8 – (ex HTM 2025 Plan 5a): two-corridor UCV operating suite with SPS prep / Appendix 7: Operating suite design logic – General / Appendix 7: Operating suite design logic – Peripheral room type / Appendix 7: Operating suite design logic – Air-movement control in peripheral rooms / Appendix 7: Operating suite design logic – Door opening / Appendix 7: Operating suite design logic – Door leakage flows / Appendix 7: Operating suite design logic – Relief of excess air from operating theatre when all doors are closed / Appendix 7: Operating suite design logic (pages 169–176) / Appendix 7: Operating suite design logic (pages 177–184) / Appendix 7: Operating suite design logic (pages 185–192) / Appendix 7: Operating suite design logic (pages 193–200) / Appendix 9: Design of air-movement control scheme for anaesthetic room203–205
55References206–210
56Abbreviations used in this document211–213