HTM 03-01 A: _Hlk37000395 – Radiopharmacy aseptic preparation facilities / _Hlk37000395 – Records required
[HTM 03-01 A – PDF page 153]
12.0 Acceptance testing: validation
12.145 The number of test positions is determined by reference to Table A.1 in ISO 14644-1.
using specialist contractors. Particle counts at locations related to the floor area as set out in table A.1 of ISO 14644 Part 1 will then be taken to establish whether the room achieves a Class 8 cleanroom standard.
12.146 The complete test methodology will be as set out in ISO 14644.
Clean room biocontamination control
Containment level 3 laboratories
12.147 BS EN 17141 gives details on clean room biocontamination control.
12.153 Validation will be as for the standard practice described in paragraphs 12.1–12.33.
Radiopharmacy aseptic preparation facilities
12.154 The room will be subject to a permeability test as set out in paragraph 12.17.
12.148 Validation will be as for a pharmacy aseptic preparation facility.
12.155 The pressure cascade and associated automatic monitoring sensors and alarms should be tested for correct operation in accordance with the design specification.
12.149 Additional radiological tests as specified in the project brief will be required. These will be carried out and/or witnessed by the client’s appointed specialist.
Isolation rooms
12.156 Validation will be as for the standard practice described in paragraphs 12.1–12.33.
Inspection, assembly and packing (IAP) rooms in sterile services departments
12.157 See Health Building Note 04-01 Supplement 1 for details of the test regime.
12.150 Validation will be as for the standard practice described in paragraphs 12.1–12.33.
Microbiological sampling
12.151 The pressure cascade and associated automatic monitoring sensors and alarms should be tested for correct operation in accordance with the design specification.
12.158 It is essential that all parts of the validation test specified above have been successfully completed and the areas thoroughly cleaned prior to any microbiological sampling.
12.159 Microbiological sampling will not normally be required for either general or local exhaust ventilation (LEV) systems unless otherwise specified within the contract.
The detail of the sealing between the instrument washers, transfer hatches and sterilizers that penetrate the walls of the IAP room will be critical in attaining the specified room pressure.
12.160 The procedure for carrying out microbiological sampling in clean rooms is set out in ISO 14644.
12.152 Following the satisfactory validation, the IAP room should be physically cleaned
[HTM 03-01 A – PDF page 154]
13.0 Information
d. a floor plan of the area served by the
Records required
13.1 There is a requirement under the Building Regulations to provide documentary evidence of the design, commissioning and subsequent performance of ventilation systems as well as recommended maintenance routines (Building Regulations. 2010, Part 8, Paragraph 39).
13.2 Electronic records should be in a format that is compatible with the client’s archive and retrieval system.
plant showing all doorways, hatches, transfer grilles, pressure relief dampers, pressure stabilisers, supply and extract terminals. The total supply and extract volumes should be shown for each room served by the plant. The volume flow and direction of flow through transfer grilles, pressure relief dampers and pressure stabilisers should also be shown, together with the room pressures in pascals measured with regard to atmospheric pressure. For operating suites the “key” door should be identified;
Handover
e. a fire plan of the area served
13.3 The following general information is required at plant handover:
a. “as fitted” drawings of the plant
showing the location of all items and listing the size of ducts, grilles and diffusers together with their factors;
b. “schematic” drawing of the air
showing the fire zone and location of all fire and smoke dampers and detectors. An explanation of the ventilation strategy in the event of an in-zone fire, adjacent zone fire or smoke being drawn into the air handling unit from an outside source should be provided.
f. wiring diagrams for all electrical
distribution system showing design and actual airflows from all outlets together with the design and actual airflows in each duct. The duct centre correction factors should be given and the grille factors;
c. the location of all volume control
equipment associated with the air handling systems including motor control circuit details and any interlocking and safety devices such as emergency stop buttons adjacent to the item of plant;
g. manufacturer’s operating instructions
dampers should be marked on the “as fitted” and “schematic” drawings;
and “setting to work” guidance for
[HTM 03-01 A – PDF page 155]
13.0 Information
n. summer inside design humidity for
all specialist components incorporated in the systems;
each room in % saturation;
h. a schematic of the control system
o. winter psychrometric chart showing
showing the location of all plant sensors;
the condition of the air between all items of plant and the design outside, supply and room air conditions;
p. summer psychrometric chart showing
i. control algorithm(s) of the actual plant operation and the set points entered during commissioning together with the control panel access codes and keys.
the condition of the air between all items of plant and the design outside, supply and room air conditions;
Plant design information
q. the design mass airflow rate used to
size the plant in kg/s;
13.4 The following plant design information is required at plant handover:
r. the design volumetric flow rate in
a. a simple statement of the design
m3/s.
intent;
b. a description of the plant’s intended
Individual equipment information
mode of operation;
Heater-batteries including energy recovery
c. winter outside design temperature in
ºCdb;
d. winter outside design humidity in %
13.5 The following information concerning heater-batteries is required at plant handover:
saturation;
a. the size of the battery, number of
e. winter room supply air design
passes and fin spacing;
temperature in ºCdb;
b. the design flow and return
f. winter room supply air design
temperatures and flow rate in L/s;
humidity in % saturation;
c. the pressure drop across the water
g. winter inside design temperature for
side of the battery in Pa;
each room in ºC;
d. the number of phases, supply
h. winter inside design humidity for
each room in % saturation;
voltage, current drawn and number of steps if electric;
e. the maximum rated capacity of the
i. summer outside design temperature in ºCdb;
battery and actual design rating in kW;
j. summer outside design humidity in % saturation;
f. the design and actual face velocity in
m/s;
k. summer room supply air design
temperature in ºCdb;
g. the pressure drop across the air side
of the battery in Pa;
l. summer room supply air design humidity in % saturation;
h. the design on and off coil air
m. summer inside design temperature
temperature and humidity at winter and summer design conditions.
for each room in ºC;
[HTM 03-01 A – PDF page 156]
Cooling coils
f. the design upstream and
downstream air temperature and humidity at winter design conditions.
13.6 The following information concerning cooling coils is required at plant handover:
a. the size of coil, number of passes and
Filters
fin spacing;
13.8 The following information concerning filters is required at plant handover:
b. the design flow and return
a. the size of the filter and number in
temperatures and flow rate in L/s if chilled water;
bank;
c. the pressure drop across the water
b. its grade;
side of the coil in Pa;
c. the design and actual face velocity in
d. the supply pressure and mass flow
m/s;
rate if direct expansion;
d. the initial pressure drop across the
e. the maximum rated capacity of the
filter when clean in Pa;
coil and actual design rating in kW;
e. the final pressure drop across the
f. the contact factor;
filter when dirty in Pa;
g. the design sensible and latent
f. the manufacturer’s name and filter
cooling loads in kW;
identification code.
h. the design and actual face velocity in
m/s;
Fans
13.9 The following Information concerning fans is required at plant handover:
i. the pressure drop across the air side of the coil in Pa;
a. the size of the fan and its type;
b. the fan curve;
j. the design on and off coil air temperature and humidity at summer design conditions.
c. speed and direction of rotation;
Humidifiers
d. the drive motor frame size;
e. the number of phases, voltage and
13.7 The following information concerning humidifiers is required at plant handover:
a. the size of the humidifier and
maximum design and actual current drawn;
number of lances;
f. the design and actual delivered air
b. the supply pressure and mass flow
volume in m3/s;
rate of the steam;
g. the fan suction pressure at high and
c. the number of phases, supply
low speed in Pa;
h. the fan delivery pressure at high and
voltage, current drawn and number of steps if electric;
low speed in Pa;
d. the maximum rated capacity of the
Attenuators
humidifier and actual design rating in L/hour;
e. the design and actual face velocity in
13.10 The following information concerning attenuators is required at plant handover:
m/s;
[HTM 03-01 A – PDF page 157]
13.0 Information
a. the size of the attenuator and
number in bank;
• General ventilation system [supply and extract] (GVS).
b. the design and actual face velocity in
• General extract systems (GES).
m/s;
c. the initial pressure drop across the
attenuator in Pa;
d. the upstream sound level in dB(A);
the downstream sound level in dB(A).
• Systems installed for smoke clearance in the event of a fire, classed as smoke and heat exhaust ventilation systems – (SHEVS) (for example, smoke extract fans in stairwells, automatic smoke clearance dampers in atria).
System information
During the design and contract process, ventilation systems are often given “construction” codes for drawing reference and site identification purposes. It is imperative that prior to handover the actual identification codes and labels affixed to the systems conform to the inventory in use at the site or desired by the client. Each system code should be unique and conform to the categorisation format for the client’s inventory given above.
13.11 The preservation of information and records of ventilation systems and their performance is a legal requirement. It is therefore essential that when new systems are completed, full information as to their purpose, design, layout and actual commissioned performance are handed on to the client. If any derogations were agreed from this standard, they should be noted and the reason for them explained. The system information if electronic (for example, BIM model) should be in a form that is compatible with the client’s IT standard and can be accessed and searched by it.
For ease of future reference, a list of design and construction references for drawings and plant, cross-referenced to the client’s building designations and plant inventory codes, should be produced.
13.12 In new “green field” developments an inventory of the installed ventilation systems should be compiled. In existing developments the client will normally have an inventory of their installed systems, and all new systems should be added to it.
13.14 For each ventilation system the inventory should contain the following details:
13.13 The inventory will be subdivided into the following categories:
• A unique system identification code (for example, LEV 001; CHV 001) as appropriate.
• Local exhaust ventilation systems (LEV) – note these are statutory items.
• The location of the ventilation fan unit or supply and extract AHU(s).
• Critical healthcare ventilation systems (CHV).
• The location of the fresh air inlet.
• The location of the extracted air discharge.
(These are systems the loss of which would seriously limit the delivery of healthcare – for example, operating suite, SCBU, critical care areas, interventional imaging suite, aseptic preparation facility.)
• The specific area(s) served by the system.