Home › England (NHS England estates) › HTM 03-01 A › _Hlk37000395 – Spares / _Hlk37000395 – BIM status

HTM 03-01 A: _Hlk37000395 – Spares / _Hlk37000395 – BIM status

Specialised ventilation for healthcare premises Part A: The concept, design, specification, installation and acceptance testing of healthcare ventilation systems · PDF pages 158–159 of 213 · Source file: HTM0301-PartA-accessible-F6.pdf
Unofficial text extract. Tables and figures may be incomplete. Authoritative version: official PDF from NHS England.

[HTM 03-01 A – PDF page 158]

• The date the system was installed.

13.18 The nature of air and direction of flow should be clearly marked on all ducts using the symbols given in BS 1710.

• The date the system was validated and accepted by the client.

13.15 Each ventilation system should have a logbook (physical or electronic) that contains the following information:

13.19 All airflow test-points should be clearly identified with a permanent label and the design information given (for example, TPS 1 – Anaesthetic supply; 400 × 300; Design 185 L/s).

• The unique system identification reference.

• Purpose of the system.

• Date of installation.

• Details of the installed equipment and ductwork layout.

13.20 If two ventilation systems supply a common room or an outlier from another zone, the room identification label should state the relevant ventilation identification codes, for example: Theatres 5&6 Utility; [CHV 012 and CHV 015], as should the labels on their individual AHUs.

• Detail of the fire plan and location of fire and smoke dampers.

13.21 Any ventilation system that conveys a hazardous substance or is affected by a hazardous radiation must be clearly marked with the appropriate symbol.

• Design performance parameters (for example, airflow rates, air-change rates, pressures).

• Commissioned date and performance.

Fire and smoke dampers

• Record of the system validation and acceptance.

13.22 A complete schedule of dampers fitted, their location and unique identification code should be provided.

• Records of the annual inspection and verification.

13.23 A statement of when they were tested and by whom should be included.

• Maintenance records and plant information (for example, fan specifications and filter sizes).

Spares

13.16 The records should be linked to the inventory and stored in such a way as to be readily available in the event of plant breakdown or other incident.

13.24 Unless otherwise agreed with the site maintenance department, spares should be stored on a rack in the entrance of the relevant plantroom and preserved from casual damage or contamination.

13.25 The scale of spare fans to be provided should relate to the number of AHUs using fans of the same size. The spare fans should be pre-wired with power and control connectors so that when used they are plug and play.

13.26 A complete set of new filters should be handed over.

13.17 Every ventilation system should be clearly identified with a permanent label. The label should show in lettering 100 mm high the inventory reference code of the AHU and clearly identify the area that it serves. The label should be mounted with screws or rivets in an easily visible place near the fan of the unit adjacent to the local electrical isolator. The system control panel should have a duplicate label. Any subsystems and the principal branch ducts should be similarly labelled.

[HTM 03-01 A – PDF page 159]

13.0 Information

them and their patients from airborne contaminants.

13.27 A complete set of any other consumable item installed in the installation should be handed over.

BIM status

13.34 In operating suites and interventional imaging suites of any type, a simplified plan of the suite showing the principal direction of air movement should be displayed at the entrance to the suite. The following bullet points should be appended to the plan:

13.28 If the installation was modelled using BIM during construction, the BIM model should be brought up to date and all asset tags incorporated prior to handover.

• The air supplied to each room is intended to dilute any airborne contaminants.

13.29 Training for estates staff who will be tasked with keeping the BIM model in date should be given, ideally while the original BIM team is available.

• The airflow between rooms will ensure that contaminants do not enter.

Maintenance routines

13.30 Any product or installation-specific maintenance routines should form part of the handover documentation and, if necessary, training.

• People are the main source of airborne contaminants; they disperse such contaminants as they move around: the more people, the more movements, the more airborne contaminants.

• Optimum conditions exist when all doors are closed.

13.31 Information on routine inspection and maintenance is given in Part B of Health Technical Memorandum 03-01.

• In order to ensure that the system operates correctly and efficiently:

Expected service life

– routine checks should be carried out of the system performance;

– the system should be taken out of use periodically to carry out essential maintenance.

13.35 The VSG should advise if other applications require similar explanatory information.

13.32 Air handling units (AHUs) have an expected service life of 20 years. Part B of this HTM states that ventilation systems should be taken out of service, deep cleaned, their controls renewed and recommissioned after 10 years. The handover information will both assist this process and help inform the selection of replacement plant.

Staff training

Additional end user information

13.36 On completion of the project, training in the correct use, operation and routine maintenance of the installed systems should be given as appropriate to the following staff groups:

• the end-users;

• those who will operate and maintain the installed systems.

13.33 The information itemised above is intended to fulfil the contract requirement and provide a record for the client and their appointed operational management and maintenance teams. There is also a need in some circumstances to provide the end-user with information as to the role that the ventilation system will play in protecting