Acknowledgements
Graham Taylor, Authorised Engineer (Ventilation), Specialised Ventilation for Healthcare Society
Hilary Humphreys, Professor of Clinical Microbiology, Royal College of Surgeons in Ireland
Ian Bryden, Head of Estates and Property, NHS Dumfries and Galloway
Ian Ferguson, Capital Projects, University Hospitals of Morecambe Bay NHS Foundation Trust
Ian Storrar, Head of Engineering, Health Facilities Scotland
Jez Beales, Consulting Engineer, DSSR
John McEwan, Senior Project Manager, Hulley & Kirkwood
John Prendergast, Publishing and Editorial, Archus Ltd
John Rayner, Authorising Engineer (Ventilation), IHEEM
Jon Fletcher, Operations Director, Interfurn Medical Systems
Karren Staniforth, Clinical Scientist, Healthcare Infection Society
Kevin Reynolds, Head of Estates, Sandwell and West Birmingham Hospitals NHS Trust
Kevin Ridge, Head of Engineering, NHS Wales Shared Services Partnership - Specialist Estates Services
Lester Stuart
Linda Dempster, Head of Infection Prevention and Control, NHS England & NHS Improvement
Malcolm Thomas, Main author
Martin Sarungi, Orthopaedic Surgeon, Golden Jubilee National Hospital, Clydebank
Michael Ralph, Principal Engineering & Senior Policy/Strategy Lead (Hard FM), NHS England & NHS Improvement
Michael Rope, Estates & Facilities Management Guidance Lead, NHS England & NHS Improvement
Mike Arrowsmith, Consulting Engineer, IHEEM
Mike Dunne, Technical Manager, Howorth Air Technology Limited
Mike Hodges, Managing Director, Apreco Limited
Nigel Keery, Head of Estates, Belfast Health & Social Care Trust
Peter Broadbent, Director, Couch Perry & Wilkes LLP
ix
[HTM 03-01 A – PDF page 10]
Peter Hickey, Assistant Director of Estates, Lancashire Teaching Hospitals NHS Foundation Trust
Peter Hoffman, Consultant Clinical Scientist, Public Health England
Richard Barry, Director, AirisQ Ltd
Richard Harris, Authorised Engineer (Ventilation), Specialised Ventilation for Healthcare Society
Rob Townsend, Consultant Medical Microbiologist, Sheffield Teaching Hospitals NHS Foundation Trust
Robert Porter, Consultant in Clinical Microbiology & Infection, Royal Devon and Exeter NHS Foundation Trust
Rosemary Jenssen, ProCure 22 Framework Representative
Sigrid Volkmann
Simon Allen, Torbay and South Devon NHS Foundation Trust
Simon Dale, Association of Anaesthetists, Chesterfield Royal Hospital NHS Foundation Trust
Steve Clifford, Consulting Engineer, Hoare Lea
Tim Boswell, Consultant Medical Microbiologist, Healthcare Infection Society
Tim Sizer, Regional Pharmaceutical Quality Assurance Officer, NHS England (South West)
Tom Ford, Director, Howorth Air Technology Limited
NHS England & NHS Improvement would also like to thank all those who took the time to comment and send contributions during the scoping and technical engagement phases of this document.
x
x
[HTM 03-01 A – PDF page 11]
Contents
Contents
Preface����������������������������������������������������������������������������������������������������������������������������������������ii
About Health Technical Memoranda ii Language usage in technical guidance ii Project derogations from the Technical Guidance iii Sustainability and ‘Net Zero Carbon’ targets iii
Executive summary���������������������������������������������������������������������������������������������������������������������v
Preamble v Who should use this guidance? vi Main changes since the 2007 edition vi
Acknowledgements����������������������������������������������������������������������������������������������������������������viii
1.0 Introduction�������������������������������������������������������������������������������������������������������������������������1 The needs of the building occupants The building environment Airborne risks to staff Airborne risks to patients Specialist equipment environment Medicinal products environment Fire and smoke control fundamentals
2.0 The user requirements �������������������������������������������������������������������������������������������������������5 Surgical procedures Medical care Mental health Palliative care Diagnostic and support services
3.0 Legal requirements – applicable legislation ���������������������������������������������������������������������9 Health and Safety at Work etc Act Control of Substances Hazardous to Health Regulations Workplace (Health, Safety and Welfare) Regulations The Building Regulations Health and Social Care Act 2008 (Regulated Activities) Regulations 2014 The Medicines Act 1968 and Human Medicines Regulations 2012 Indoor air quality (IAQ) Other relevant standards and sources of guidance
xi
[HTM 03-01 A – PDF page 12]
4.0 The design and specification process�������������������������������������������������������������������������������12 Project brief Basis of design Ventilation Safety Group (VSG) Derogations and alternative design strategies Definition of clinical areas and critical systems Resilience and diversity New build facilities Refurbishment of existing facilities and fitting out shell schemes Change of use of existing facilities Computer-aided design (CAD) and building information modelling (BIM)
5.0 Ventilation strategies �������������������������������������������������������������������������������������������������������23 Natural ventilation Mixed mode ventilation Mechanical ventilation
6.0 Energy control strategies �������������������������������������������������������������������������������������������������32 Timed control Occupancy control – user triggered User control
7.0 Environmental control ������������������������������������������������������������������������������������������������������35 Building construction factors User requirements
8.0 Specific healthcare department requirements����������������������������������������������������������������39 General considerations Operating department Ultra-clean ventilation system Barn and semi-barn theatres Hybrid theatres Neutral pressure theatres for infectious patients Interventional imaging suites Other application-specific design guidance Hydrotherapy: general requirements Extract systems Plantroom ventilation
9.0 Equipment selection factors���������������������������������������������������������������������������������������������74 General requirements Supply AHUs and associated extract units Distributed air-conditioning elements AHUs: automatic control Local exhaust ventilation (LEV)
10.0 Installation standards����������������������������������������������������������������������������������������������������106 General
xii
xii
[HTM 03-01 A – PDF page 13]
Contents
AHUs Distribution systems Point of use Service penetrations Floor marking
11.0 Commissioning systems ������������������������������������������������������������������������������������������������111 General Pre-commissioning checks Dynamic commissioning Specific performance standards Ventilation system commissioning records
12.0 Acceptance testing: validation �������������������������������������������������������������������������������������121 Appointment of validator Design proposal review First fix inspection Permeability testing Follow-on inspections Final acceptance inspection: validation UCV canopy leakage tests Vertical flow UCV canopy air velocity tests UCV canopy entrainment test UCV terminal control system checks UCV theatre microbiological tests UCV operating suite validation report Pharmacy aseptic preparation facilities Radiopharmacy aseptic preparation facilities Inspection, assembly and packing (IAP) rooms in sterile services departments Containment level 3 laboratories Isolation rooms Microbiological sampling
13.0 Information �������������������������������������������������������������������������������������������������������������������138 Records required Handover Spares BIM status Maintenance routines Expected service life Additional end user information Staff training
Appendix 1: Typical AHU plant layouts���������������������������������������������������������������������������������144
Supply AHU with remote extract unit Double-stacked supply and extract AHU Cabinet AHU
xiii
[HTM 03-01 A – PDF page 14]
Appendix 2: Summary of design conditions�������������������������������������������������������������������������147
Appendix 3: Hierarchy of cleanliness�������������������������������������������������������������������������������������149
Appendix 4: Leakage flows in m3/s through closed door gaps��������������������������������������������150
Appendix 5: Recommended airflow rates in m3/s through a doorway between rooms of different cleanliness to control cross-contamination�����������������������������������������������������������151
Appendix 6: Typical approximate pressures in an operating suite when a given door is open����������������������������������������������������������������������������������������������������������������������������������������152
Appendix 7: Operating suite design logic�����������������������������������������������������������������������������153
Standard layout 1 – Two-corridor conventional operating suite with “lay-up” prep Standard layout 2 – two-corridor UCV operating suite with SPS prep Standard layout 3 – single-corridor conventional operating suite with “lay-up” prep Standard layout 4 – single-corridor UCV operating suite with SPS prep Standard layout 5 – (ex HTM 2025 Plan 1b): single-corridor conventional operating suite with “lay-up” prep Standard layout 6 – (ex HTM 2025 Plan 1a): single-corridor UCV operating suite with SPS prep Standard layout 7 – (ex HTM 2025 Plan 5b): two-corridor conventional operating suite with “lay-up” prep Standard layout 8 – (ex HTM 2025 Plan 5a): two-corridor UCV operating suite with SPS prep
Appendix 8: Design of air-movement control schemes for operating theatres������������������162
General Peripheral room type Air-movement control in peripheral rooms Door opening Transfer grilles Pressure-relief dampers Pressure stabilisers Door leakage flows Room temperature estimation Relief of excess air from operating theatre when all doors are closed
Appendix 9: Design of air-movement control scheme for anaesthetic room���������������������185
General Low-level extract installation Operating theatre to anaesthetic room air-transfer device
Appendix 10: Example cause-and-effect check-sheets��������������������������������������������������������187
Example cause-and-effect check-sheet for general theatre or imaging suite Example cause-and-effect check-sheet for ultra-clean theatres
References������������������������������������������������������������������������������������������������������������������������������190
Acts and regulations European regulations British Standards
xiv
xiv
[HTM 03-01 A – PDF page 15]
Contents
Health and Safety Executive guidance Health Technical Memoranda Health Building Notes Other publications Other guidance
Abbreviations used in this document������������������������������������������������������������������������������������195
xv