Home › England (NHS England estates) › HTM 03-01 A › _Hlk37000395 – Operating department

HTM 03-01 A: _Hlk37000395 – Operating department

Specialised ventilation for healthcare premises Part A: The concept, design, specification, installation and acceptance testing of healthcare ventilation systems · PDF pages 60–67 of 213 · Source file: HTM0301-PartA-accessible-F6.pdf
Unofficial text extract. Tables and figures may be incomplete. Authoritative version: official PDF from NHS England.

[HTM 03-01 A – PDF page 60]

Air handling unit

8.25 AHUs should be to the standard set out in Chapter 9. The extent of the system served by an individual AHU should reflect the operational need and required resilience of the application.

revision and will be replaced by a single document: Health Building Note 10-01. It will provide guidance on the planning and design of infrastructure for in- patient and day-patient surgical services in the UK.

Fire aspects

8.26 When considering the overall airflow movement, careful thought needs to be given to the operation of the ventilation system to limit smoke spread in the event of a fire.

8.29 For other types of operating suite, the standard values may need to be adjusted to reflect non-standard room sizes, pressure regimes and air-change rates. A method of obtaining a design solution for non- standard theatres from first principles is given in Appendix 8 (see also paragraph 8.3 and accompanying Note).

Operating department

General

Standard air movement control schemes

8.27 An operating department will consist of one or more operating suites, a recovery area, sterile pack and equipment stores, entry/exit/service corridors, office, staff changing and support facilities. Each operating suite will typically comprise a preparation room, operating theatre, anaesthetic room, scrub area and a utility room. In order to ensure satisfactory conditions and the correct movement of air, the entire department will usually be mechanically ventilated.

8.30 In all previous versions of this guidance, standard air-movement control schemes were given that provided a range of design solutions for typical operating- suite layouts. Improvements in the technology of ventilation control systems coupled with the ability to accurately sense and control real-time fan output has enabled operating-suite ventilation parameters to be tightened. These now more accurately meet the airborne- infection-control requirement (see the Lidwell Report). The previous standard design solutions have therefore been fully revised to take advantage of the technological advances and benefit from the reduced energy consumption and plant size they allow.

8.28 The information given in this section relates to conventional operating suites used for general surgery. It will be applicable to other types of operating suite such as maternity whose layout and dimensions conform to the principles of Health Building Note 26 (see Note below). Additional information for UCV theatres is given in paragraphs 8.75 onwards.

Health Building Note 26 − ‘Facilities for surgical procedures’ (2004) and Health Building Note 10-02 − ‘Facilities for day surgery units’ (2007) are under

8.31 A new set of standard operating suite design solutions extensively amended to conform to the guidance contained in this edition of Health Technical Memorandum 03-01 are given in Appendix 7. They contain diagrams that show the relationship of rooms and the various doors and transfer devices between them but should not be regarded as architectural layouts. The schemes have been developed using the methodology described in Appendix 8.

[HTM 03-01 A – PDF page 61]

8.0 Specific healthcare department requirements

agents and maintain a suitable environment for patients.

These design solutions should be used for new projects and when refurbishing or upgrading existing operating suites.

• Scrub – to remove aerosolised microbiological contamination and moisture released when staff scrub- up.

8.32 Any other scheme may be used, and the standard solutions applied, if the following conditions are met:

• room relationships in air network terms are as shown in the plans;

• room sizes and shapes approximate to those given in Health Building Note 26 (under revision at the time of writing and to become Health Building Note 10-01);

• Utility (also known as sluice or disposal) – to contain any airborne hazards arising from the initial processing of biological material, contaminated instruments and general waste and prevent it entering the operating theatre or adjacent spaces.

• door gaps approximate to those given in the designer’s notes in Appendix 4;

• Entry/exit/service corridors – to remove vitiated air cascading from the operating suite(s).

• casual heat gains are accounted for;

• a trimmer battery is installed in the air supply to the anaesthetic room;

• Sterile pack and equipment stores – to prevent airborne contamination of the packs and equipment.

• Staff changing, shower and toilet facilities – odour control and moisture removal.

• leakage through the structure is kept to a minimum. Note that theatre suites will be subject to an air permeability test at first-fix and final validation (see Chapters 10 and 12).

• Staff rest room – moisture and odour control.

• Office and general areas – comfort conditions.

It is recommended that every effort should be made to adopt one of the schemes described above.

Ventilation design requirement

• Recovery – to protect staff from casual exposure to exhaled anaesthetic agents and maintain a suitable environment for patients.

8.33 The need for ventilation of the individual rooms and areas within the operating department will be as follows:

• Preparation room – to protect sterile packs and instruments from pre- contamination.

The ventilation requirement for each space will be met by the desired air-change rate, room pressure differential, relative position of the room supply and extract, comfort requirement or a combination of all elements.

• Operating theatre – to control the airborne infection risk, remove airborne contaminants and prevent the ingress of airborne contaminants from adjacent areas.

• Anaesthetic room – to protect staff from casual exposure to anaesthetic

8.34 Preparation room – sterile pack store (SPS) – The preparation room is used simply as a store; sterile packs are set out on trolleys but not opened. They are then transferred to the operating theatre and opened as required. The nominal room

[HTM 03-01 A – PDF page 62]

discharged through the pressure stabiliser may be used to offset the volume of supply air to the operating theatre.

pressure can therefore be the same as that of the operating theatre and the air allowed flow between the rooms in either direction. Air supplied to the preparation room should be directed into the operating theatre either through a door-mounted transfer grille or if no door is fitted, through the opening. It should not flow via a pressure stabiliser or transfer grille into the corridor.

It is undesirable to share a “lay up” preparation room between two theatres as it complicates the air movement scheme and in practice becomes a shortcut for staff. If door interlocks are provided, staff often disable them. If space does not allow the provision of individual lay-up preparation rooms, a central lay-up preparation room with instrument transfer to individual theatres in closed trolleys should be considered.

8.36 Operating theatre – The supply of air to an operating theatre has four main functions:

a. to dilute airborne microbial

contamination – this will arise from the surgical activity and microbiological material shed by staff;

b. to aid the removal of and dilute

fumes, odours and waste anaesthetic agents;

8.35 Preparation room “lay up” – When the preparation room is used as an instrument “lay up” room (that is, sterile packs are opened and their contents exposed ready for transfer to the operating theatre), it should be regarded as being of greater cleanliness than the operating theatre. The preparation room should be at 10 Pa above the operating theatre to minimise the transfer of air and prevent pre- contamination of the instruments. The design air supply volume should relate to the door protection factors (for example, open door to theatre and closed door or hatch to corridor, where provided) and result in not less than 22 ac/h. Air should discharge into the operating theatre through a pressure stabiliser fitted with a stand-off baffle plate on the theatre side (see photograph). It should not flow via a pressure stabiliser or transfer grille into the corridor. The volume of supply air being

c. to control air movement so that the

Pressure stabiliser fitted with stand-off baffle in preparation “lay up” room

airborne contaminants from other less clean areas do not enter;

d. to control the temperature and if

necessary, the humidity of the room.

Design notes

• An air-change rate of 22 ac/h will control (a) and (b) above. When calculating the air volume required to achieve the air-change rate, the physical volume of the operating theatre will be based on whether the scrub does or does not form part of it. See Note to paragraph 8.46 for further information.

[HTM 03-01 A – PDF page 63]

8.0 Specific healthcare department requirements

theatres the door protection factor may dominate.

• The room to corridor differential pressure and amount of air required to give door protection will control (c). Door protection is calculated on the basis that during use, only one door or a single leaf of a double door will be open transiently, and all the rest will be closed. The designated “open” door will be the worst case (for example, typically that between the operating theatre and utility). The volume of supply air can be calculated from the flow rates for open and closed door protection given in Appendices 4 and 5. The smaller the number of rooms (and therefore doorways) leading from the operating theatre the better, as traffic is reduced, and a less complicated air movement control scheme is required.

8.37 The supply and extract terminals should be positioned to ensure that all parts of the operating theatre are actively ventilated. The ceiling should be divided into four quadrants and a supply terminal positioned at the centre of each quadrant and along the lines that join them as necessary to ensure that all parts of the room are equally supplied. In a large theatre, additional terminals around the centre point may be necessary to promote efficient scouring and achieve satisfactory air movement at the operating table level. This will help create in ventilation terms a well-mixed space and ensure good dilution of any airborne contaminants. Extract and air-out paths via door gaps, transfer grilles, pressure stabilisers and low-level active extract should be evenly distributed to encourage efficient scouring of the room. A minimum of three and preferably four air-out paths, approximately equally spaced, should be provided.

• The supply air volume to control (d) temperature and humidity conditions can be calculated conventionally, taking account of all heat and moisture gains and losses resulting from equipment, lighting and number of occupants. Supply to room air temperature differences of up to 10 K for winter heating and 7 K for summer cooling should not be exceeded. Room humidity should not exceed 70% saturation.

The design supply air volume for an operating theatre will be whichever of the above calculations yields the greater figure.

In order to ensure correct air distribution, it is essential that the supply terminal locations are not displaced by light fittings or ceiling-mounted pendants and articulated booms. Ideally the supply terminals should alternate with light fittings along the quadrant lines described above.

In the case of an operating suite with a “lay up” preparation room, the actual air volume supplied by the operating theatre terminals will be the design air volume determined above minus that entering via the preparation room pressure stabiliser.

8.38 Supply terminals should be ceiling- mounted circular “air master” style, square “four-way blow” or perforated plate style that produce a downward displacement, turbulent airflow (see paragraph 9.170 onwards). Multi-section plenum-style perforated-flow diffusers with a footprint that encompasses the operating site are acceptable but may be prone to buoyancy effects as a result of temperature difference. Manufacturers’ type test data

In the majority of operating theatres the air-change rate will be the dominant factor; however for small operating

[HTM 03-01 A – PDF page 64]

should be consulted to ensure that the terminal will achieve the required performance envelope. Note that these are not true laminar flow systems in the strict sense of the word but produce a downward displacement parallel flow style of air distribution.

disconnection, and from the interface with the patient. The room ventilation scheme should ensure that any leakage is diluted and removed, and that staff are in a clean airflow path. Locating the supply terminal on the ceiling in a position behind where the anaesthetist will normally stand, and the extract terminal at low level adjacent to the medical gas pipeline terminals, will encourage a clean airflow path past the breathing zone of the anaesthetist, thus reducing their casual exposure to airborne anaesthetic agents. (See information in Appendix 9.)

8.42 An operating theatre suite anaesthetic room that is equipped with a N2O terminal or in which an anaesthetic agent is delivered to the respiratory tract of a patient using a carrier gas should have a design primary supply and extract flow rate to achieve 15 ac/h.

Where an operating theatre requires a higher than normal air-change rate (for example, cranial surgery, which may specify 35 ac/h), the volume of supply air means that four-way blow diffusers would be noisy and probably cause unacceptable draughts. A UCV terminal would deliver too much air, which could result in exposed tissue drying out during the procedure. A multi-section, plenum-style perforated flow diffuser with a footprint that encompasses the operating site would be the most suitable option.

8.43 In order to maintain the core temperature of patients being anaesthetised, a trimmer heater-battery should be provided in the anaesthetic room supply. It is also important that the location of pressure stabilisers and transfer grilles does not cause draughts across the patient.

8.39 The diffuser equipment chosen should not cause “dumping” and provide an air velocity 1 m above floor level at the operating position of between 0.2 m/s and 0.3 m/s.

8.44 The anaesthetic room will be at an intermediate pressure between the operating theatre and corridor.

8.40 Horizontal flow distribution should not be used in new installations; however, space constraints may force its retention when refurbishing existing installations. Where fitted, the supply grilles will require a means of directional adjustment that is lockable in position to prevent casual alteration in future when being cleaned.

8.45 Scrub – This may be a separate room or a bay within the operating theatre. If the scrub is a separate room, a door between the scrub and operating theatre is an inconvenience to scrubbed staff and may be replaced by an opening that is larger than a normal single doorway. If a door is fitted between the scrub and operating theatre is should have a transfer grille in its lower half. In either case there should be an active extract at low level under the end of the scrub trough most remote from the operating theatre, or a low-level pressure stabiliser that discharges onto a corridor at the end of the scrub room most remote

8.41 Anaesthetic room – Anaesthetic gas or anaesthetic agents will be delivered to the respiratory tract of a patient either directly or using a carrier gas. Anaesthetic gases and agents are subject to workplace exposure limits and while beneficial to the patient are harmful to staff. Some leakage from the anaesthetic equipment and the patient’s breathing circuit will occur with all systems, particularly during connection and

[HTM 03-01 A – PDF page 65]

8.0 Specific healthcare department requirements

from the operating theatre (see photograph). If the scrub has an outside wall and/or is particularly large, additional extract terminals may be required to ensure air movement throughout the entire space and prevent surface condensation and mould growth.

Scrub room with extract under trough

the operating theatre so that contaminants contained in the surgical waste do not re-enter the operating theatre. A utility opening onto a clean corridor is considered to pose a greater risk than one opening onto a service corridor and so has a greater differential pressure. A utility may be shared between two operating theatres or be centralised to serve a group of operating suites.

8.48 Entry/exit corridor – Air cascading from the operating suite should be removed in the adjacent corridors. Note that though design flows may be calculated, the actual extract airflows may need to be adjusted at commissioning in order to achieve the design room differential pressures.

8.46 Where the scrub is a trough on the wall or in an open bay within the operating theatre, it should have low-level extract under it.

8.49 Service corridor – If materials to be disposed of are placed in impervious material for transportation, it is not necessary to have a separate corridor for this purpose. However, a service corridor has many operational advantages in terms of the flow of materials through the operating suite. It provides a heated envelope around the operating suite, thus obviating the need to run the theatre ventilation out of hours to maintain its temperature above dew-point, so significantly reducing energy consumption. Lastly it permits access for routine service and maintenance, and the eventual refurbishment of an operating suite without compromising the use of adjacent suites.

8.50 Sterile pack store – The central operating department sterile pack and prosthesis store should be supplied with 6 ac/h and be at a positive pressure to their corridor. It is important to coordinate the position of the supply air terminals with any racking so that the terminals are accessible for annual airflow measurement with a balometer.

If the Scrub is in effect a separate room that is open (no door) to the operating theatre and it has a low-level pressure stabiliser discharging onto a corridor or an active low-level extract at its far end, so that air has to travel through the scrub to leave the operating theatre, the volume of the scrub will not be counted as being a part of the operating theatre room volume. If the scrub is a trough on the wall or in an open bay within the operating theatre, the volume of space it occupies will be considered part of the operating theatre room volume for the purpose of calculating the operating theatre air supply.

8.47 Utility (sluice or disposal) – The room is kept at negative pressure with respect to

8.51 Equipment store(s) – Supply air ventilation only to keep them at positive pressure to the corridor.

[HTM 03-01 A – PDF page 66]

8.52 Staff changing, shower and toilet facilities – ventilation as per building regulations and for moisture control.

8.60 Air extracted from operating suites should not be recirculated as it may contain malodorous contaminants.

8.53 Staff rest room – Ventilation for kitchen area and general comfort.

8.54 Office and general areas – Ventilation as per building regulations and comfort.

Where thermal wheels are used for energy recovery, the small leakage across them from extract to supply should not cause odour problems and is not considered aerobiologically significant. In any event, all the air supplied will pass through the final filter.

Operating suite pressure regime

8.55 Recovery room – Anaesthetic agents will be exhaled by patients while recovering; they are subject to workplace exposure limits and are harmful to staff. Anaesthetic gas scavenging systems (AGSS) will be provided but the room ventilation scheme should ensure that any leakage is diluted and removed.

8.56 The supply air terminals should be ceiling-mounted above the foot end of the recovery bed positions. Extract should be at low (bed height or below) level behind the bedhead positions or in the corners of the bed bay. This will establish a clean airflow path so that staff do not inhale anaesthetic agents exhaled by recovering patients (see the COSHH Regulations).

8.61 When designing the ventilation scheme the room pressure differentials given in Appendix 7 should be used. However, when the suite is balanced and commissioned these values are not to be taken as immutable but rather as desired orders of magnitude. What is important is the direction of airflow between rooms when doors are closed. Specifying doors of a laboratory standard that close and sit against a seal or have drop seals on their bottom edge is not necessary and will be counterproductive of the aim to allow air to flow from clean to less clean areas.

8.57 In an operating department recovery room, the design primary air supply will be 15 ac/h with a balanced airflow.

General notes

Fire officers often require that doors are fitted with cold smoke seals as standard. These will significantly reduce the door- leakage rate and increase the differential pressure when new and undamaged. It is therefore recommended that provision for the design door leakage be factored into the sizing of the appropriate transfer grille or pressure stabiliser.

8.58 Supply flow rates for the main rooms of the operating suite are given in Appendix 7. For the other areas where room sizes and activities vary from site to site, air-change rates are given in Appendix 2 and Tables 2–7 in this chapter. These figures have been found to give enough dilution of airborne microbial contaminants, provided the mixing of room air is reasonably uniform.

Temperature and humidity control and indication

8.59 For conventionally ventilated operating theatres, the primary air supply would be filtered in the AHU. Terminal filters, EPA or HEPA, are not required.

8.62 In an operating theatre the temperature should be adjustable within the range 18ºC to 25ºC by the staff at the

[HTM 03-01 A – PDF page 67]

8.0 Specific healthcare department requirements

located at the operating department staff control base (see the Specialised Ventilation for Healthcare Society’s (2017) SVHSoc.01 – ‘Operating theatres: energy control strategies and the surgeon’s panel’ for further details).

8.68 The following indicators should be incorporated in the theatre control panel and their functions clearly labelled.

theatre control panel. The ventilation system should be capable of maintaining an internal temperature of 20ºC at summer outside design and 22ºC at winter outside design in all but the most extreme outside conditions. There may be instances where these temperatures may not be appropriate (for example, children and patients with a low body mass). The internal design temperatures should then be discussed with the VSG and agreed in writing.

• A readout sufficiently large (25 mm) to be clearly visible from the operating table that shows the temperature of the air in the theatre.

• A readout sufficiently large (25 mm) to be clearly visible from the operating table that shows the relative humidity of the air in the theatre.

8.63 Theatre temperature and humidity control sensors should be actively ventilated. They would typically be located in a sampling extract duct mounted in or adjacent to the theatre control panel, positioned at normal working height (1.5 m above finished floor level). Alternatively, they may be mounted in one of the operating theatre’s low-level extract ducts. Whichever location is chosen they should be accessible for cleaning, and removable for periodic calibration and replacement.

• A red indicator light that will illuminate when either the supply AHU fails or is switched off or is in “Set back” (legend: “Theatre not to be used in this condition”).

8.64 Passive wall-mounted temperature and humidity sensors are not recommended.

• A green indicator light that will illuminate when the supply AHU is operating at full speed (legend: “Conventional theatre mode”).

8.65 Controls should be provided to enable operating department ventilation plant to be closed down when the operating suites are unoccupied (see also Chapter 9).

8.66 When in the “off” mode, to provide dewpoint protection the control system should switch the ventilation “on” to “Set back” if the space temperature falls below 16ºC.

In touch-screen panels, the red indicator should be a band across the screen with the statement “Theatre ventilation not operational. Do not use”. The green indicator may be moving arrows representing airflow with the legend “Ventilation operational”.

8.69 The humidity within the operating department when in use should fall within the range 35% to 60%. Where it is considered necessary to fit a humidifier, it should be selected to humidify to 40% saturation at 22ºC during the design winter outside conditions. The cooling coil should be able to remove sufficient moisture so

8.67 All operating theatres and rooms where surgical interventions are carried out should have a control panel mounted on a wall with its screen centre at 1.5 m high and in the direct line of sight of staff standing at the normal operating position. The theatre control panel should include plant status indication, clearly readable temperature and humidity indicating gauges, and a means of adjusting the set point for temperature. Theatre ventilation plant status indication should also be