10.0 Installation standards
General
rubbish, builders’ debris or any other possible source of contamination.
10.5 “Builders’ work” ducts of brick or concrete should have a smooth internal finish and be surface sealed to prevent the release of dust before being taken into use. They should be fitted with a drainage system if not self-draining.
10.1 AHUs, ductwork sections and associated elements of the ventilation system will be delivered to site suitably packaged to protect them from damage and casual contamination. They should remain protected when stored on site awaiting installation.
10.2 Ductwork should be installed to the “Advanced Level” as defined in BESA’s (2019) ‘TR/19: Guide to good practice – internal cleanliness of ventilation systems’. Should any doubt exist as to whether the guidance has been observed, the ducts should be cleaned internally to restore them to this standard and be visibly clean before being taken into use.
10.6 Every effort should be made to prevent the internal contamination of the ventilation system during the construction phase as once contaminated, it is extremely difficult to completely remove dust and debris. In particular, extract and recirculation fans should not be run up until the area is at least “builders clean” – that is, the floors swept and wet-mopped – otherwise the energy-recovery device in the AHU could become contaminated and its efficiency significantly reduced.
AHUs
10.3 When the ventilation elements are installed, all open ends have to be sealed to prevent the ingress of construction dust as installation progresses. The access doors and panels of AHUs should be kept closed. All AHU dampers and fire dampers should be covered to prevent casual contamination during the construction phase. This is particularly important for fire dampers mounted in the plantroom floor. The damper blades should be wiped clean before final connection to the distribution ductwork.
10.7 Units should have a working life of up to 20 years; it can be anticipated that over this period there will be a need to access every element within the unit for deep cleaning. It is also quite possible that during the life of the unit, the main fan and all control valves will need replacement. Heater and cooling coils may also need to be repaired or replaced. Suitably positioned service connection joints and adequate
10.4 The area around the supply air intake should be kept free of vegetation, waste,
[HTM 03-01 A – PDF page 123]
10.0 Installation standards
spacing should permit these items to be isolated and withdrawn without the need to drain down entire systems or dismantle other installed plant.
and traps should always be allowed. Easy access for maintenance of drainage systems and their associated pipework should be provided. It should be possible to fully withdraw the drainage tray if it is of the removable type.
10.8 Care should be taken during installation to ensure that electrical and mechanical services are not installed in positions that will reduce or impede access. Mounting all control valves and fan controllers on a frame positioned adjacent to the unit is the preferred option. This approach has the advantage that the frame and its components can be built and tested “off-site”.
10.13 AHUs should be positioned so that all parts are easily and safely accessible for routine inspection and service. If a unit is located against a wall or backs onto another unit, access to all parts should be available from the front. Units greater than 1 m wide should preferably have access from both sides or access doors large enough to permit the full and safe entry of maintenance personnel.
10.9 In order to reduce the effects of galvanic corrosion, black iron fittings should not be used in the pipework installation. Rolled jointed stainless-steel pipework is preferred.
10.14 Air filters, cooling-coil drainage trays and drift eliminators are all items that should be changed, inspected or withdrawn on a regular basis. The installation of the AHU should permit this without the need for tools or to dismantle other plant or systems.
10.10 Vibration from a remote plantroom can be transmitted by the structure of the building, and may be regenerated and sometimes magnified many times. Pipe and ductwork should incorporate anti-vibration couplings, pipe hangers and supports, preferably in two planes at right angles, as close to the vibration source as possible.
10.15 Access to air intakes and discharges, AHUs and items in the distribution system such as filters or auxiliary trimmer batteries located in a plantroom or plant area should be via fixed ladders, hook ladders, pulpit style steps or other moveable access platforms. The installation of distribution ductwork and other electrical or mechanical services should provide sufficient clearance to allow access equipment to be moved into position.
Distribution systems
10.11 The service connection points for pipework and electrical conduits will have been made during construction of the unit. The unit will then have been leak-tested in the factory prior to delivery to site. If there is a need to drill through the AHU casing or panels (for example, to mount a sensor), the hole should be as small as practicable and sealed to prevent air leakage.
10.16 Where ductwork penetrates a roof, it should be protected by an upstand to prevent water penetration. Where it penetrates an outside wall, the method of installation should prevent water tracking along the ductwork into the building or its wall cavity.
10.12 It is essential that the AHU/ductwork is mounted far enough from the floor to permit the correct installation of drainage systems for cooling coils, humidifiers and heat recovery systems. If the AHU is located on a roof, it will require a clearance of 600 mm to provide access to maintain the building structure below. Sufficient height for the installation of drainage pipework
10.17 The installation of all services in service ducts and above ceilings should be
[HTM 03-01 A – PDF page 124]
when a post-cleaning rebalance is undertaken.
coordinated so that cable trays, medical gas and other pipework do not obstruct or prevent access to the ductwork cleaning doors, dampers and any auxiliary plant elements. The use of BIM should highlight clashes at the design stage.
10.21 Access to VCDs or local auxiliary fans mounted above ceilings should be via low- leakage access hatches mounted in the ceiling or hatches integral to a light fitting.
Obtaining access by removing a light fitting is not acceptable.
10.18 Plant elements such as VAV boxes, trimmer heaters or cooling coils, humidifier lances or branch filters that are located outside of plant spaces should be accessible for routine inspection and have a cleaning access door on both sides. They cannot be installed above any of the following areas:
• operating theatres;
10.22 Where ducts are drilled to provide test holes or to mount sensors, the swarf should be removed, and the hole deburred before the fan is started.
• preparation rooms or sterile pack stores;
• anaesthetic rooms or recovery areas;
• rooms containing imaging equipment;
Care should be taken to prevent the inadvertent drilling of attenuators.
• pharmacy clean rooms;
• containment laboratories;
• patient bedrooms and isolation rooms.
10.23 Flexible ductwork may only be used if there is no other way of connecting an air terminal to a duct. The flexible duct should be not more than 0.5 m in length, be as fully extended as possible and never used in lieu of a bend. The fire rating of the flexible duct should be no less than that of the fixed duct that it is connected to (see also paragraphs 9.131 and 9.160).
10.19 Rectangular ductwork sections should be joined by bolted or clipped gasketed flanges. Circular and flat-oval slip-joints should be mastic-sealed and held with blind rivets, not screws. The mastic used should not support biological growth. The ductwork installation will be leak-tested prior to acceptance.
10.24 Fire and smoke dampers must be installed strictly in accordance with their manufacturer’s instructions. There will be a rectangular access hatch (saddle mounted for circular ducts) and test switch adjacent to the damper so that a single person can trigger the damper and directly observe its operation during the annual test (see photograph). When pressure stabilisers incorporate a fire damper, the test switch is to be located in an easily accessible position on the less clean side of the pressure stabiliser.
10.20 Volume control dampers (VCD) should be oriented so that their adjusting handles or knobs are located at the lower vertical edge or bottom of the damper when mounted above ceilings. The means of adjusting the damper will be within sight and reach from a designated ceiling void access hatch once the ceiling is complete. Volume control dampers mounted in any location should have the control adjuster mounted to allow easy access for the commissioning team and for future access