10.0 Installation standards

Fire damper with test switch and inspection hatch

fact that there will be a unit in the room but are taken as the desired position by those carrying out the installation. As an example, the installation drawing for an interventional imaging room shows a fan coil unit in the centre of the ceiling. If it is installed in this position it will be directly above the scanner once that is installed. The fan coil unit will then not be accessible for routine inspection and maintenance, and should it leak water, it will put the scanner out of action.

10.27 The installed position of ceiling terminals in storerooms (for example, a theatre’s bulk sterile pack store) should coordinate with the siting of the storage racking. The airflow at the terminals should be routinely measured, so the racking and its contents should not obstruct access to the terminal when using a calibrated hood. The same problem can occur in recovery rooms and ward areas where bed curtain rails and bed hoist tracks can prevent the measurement of airflow from ceiling terminals.

10.28 Low-level extract grilles should be of the pull off face type for ease of cleaning.

Point of use

10.29 See pictures of low level extract installations in Appendix 9.

10.25 Items of equipment that require access for inspection and cleaning should not be accepted if they are installed in locations that prevent easy access.

Service penetrations

10.30 Where services penetrate the fabric of the building, they should be sealed to prevent any uncontrolled air leakage between rooms and service spaces or voids. Situations where this occurs will be:

10.26 Items of equipment that require access for inspection and cleaning such as fan coil units will not be accepted if they are installed directly above medical or diagnostic equipment.

• service spaces behind IPS panels at wash basins and scrub troughs;

• cased in wall-mounted medical gas pipeline units and ceiling-mounted pendants;

A common problem occurs because installation layout drawings show fan coil or similar units on the room plan. These are often only “indicative” of the

• electrical trunking and bedhead rail systems;

[HTM 03-01 A – PDF page 126]

Floor marking

• boxed-in main and local drainage pipework;

• ceiling-mounted operating lights, examination lights and other pendant- supported items.

10.31 In UCV theatres the entire “clean zone” under the UCV canopy will be designated by a contrasting colour of flooring material. A line marked on or cut into the floor covering is not sufficient.

The “clean zone” is not the same as the overall size of the canopy, and it is vital to consult the UCV canopy supplier in order to get the position and size of the zone correct, as mistakes are expensive to rectify.

The sealing should be at the point that the service penetrates the wall, ceiling or floor and not at the access panels or covering shrouds as these will need to be removed from time to time. Sealing of the penetrations should be done at first-fix stage as access will become progressively more difficult once final covers and finishes are applied. In certain applications, permeability testing will be carried out at first-fix stage to ensure that this has been done.