Specialised ventilation for healthcare premises Part A: The concept, design, specification, installation and acceptance testing of healthcare ventilation systems · PDF pages 27–29 of 213 · Source file: HTM0301-PartA-accessible-F6.pdf
Unofficial text extract. Tables and figures may be incomplete. Authoritative version: official PDF from NHS England.

[HTM 03-01 A – PDF page 27]

3.0 Legal requirements – applicable legislation

The Medicines Act 1968 and Human Medicines Regulations 2012

Environment, Food and Rural Affairs (Defra) gives data for outdoor air quality by postcode for the UK. This enables designers to choose suitable filter grades by location and application (see the Specialised Ventilation for Healthcare Society’s (2018) SVHSoc.02 – ‘Change in air filter test and classification standards’ for further information).

3.11 Pharmacy aseptic preparation facilities should conform to the requirements of EudralLex – Volume 4 – Good Manufacturing Practice (GMP) guidelines or equivalent UK legislation, and the requirements of the UK Medicines Inspectorate (MHRA) if a licensed manufacturing unit.

Other relevant standards and sources of guidance

3.15 The Chartered Institution of Building Services Engineers (CIBSE) Guides and associated published documents (TMs) are the principal source of general ventilation specification and design guidance.

3.12 There are specific requirements under the Medicines Act 1968 to maintain accurate records of plant performance, room conditions and maintenance events. Such records would need to be preserved for up to 25 years as part of a quality assurance audit trail.

3.16 ISO 14644 provides basic information on clean rooms used in pharmacy preparation facilities and inspection, assembly and packing (IAP) rooms for the processing of medical devices in sterile services departments.

3.13 Specialised ventilation plant installed in laboratories dealing with research, development or testing, whether involving drugs, animals or genetically modified microorganisms, may be subject to legislation regarding their operation in addition to that mentioned above.

Indoor air quality (IAQ)

3.17 BS EN 15780 applies to both new and existing ventilation and air-conditioning systems and specifies the assessment criteria of cleanliness and cleaning procedures of these systems.

3.18 HSG 258 issued by the Health & Safety Executive provides guidance on the design of local exhaust ventilation (LEV) systems.

3.19 Other relevant guidance is listed in the References.

In all cases the most recent version of any legislation, regulation, standard or guidance document should be consulted.

3.14 There is increasing awareness that IAQ has an important impact on health and well-being. The World Health Organization and the Royal College of Paediatrics and Child Health (2020) have produced papers on the importance of IAQ, and the National Institute for Health and Care Excellence (NICE) (2020) has issued guidelines for domestic environments. Indoor and outdoor sources of contaminants are important contributors to IAQ, and designers of ventilation systems should consider both. The Department for

[HTM 03-01 A – PDF page 28]

4.0 The design and specification process

Project brief

Basis of design

4.3 This HTM assumes that designers will be familiar with current CIBSE guidance and will use it as the basis for specifying and designing ventilation systems. However, the actual guidance contained in this HTM may differ from the CIBSE guidance due to healthcare-specific issues and will take precedence over the CIBSE guidance where there are conflicts.

4.1 The ventilation aspects of a contract will normally form part of a wider project to provide, upgrade or replace a healthcare facility. It is important that the ventilation designer closely liaises with the architect, as the layout of the facility and the adjacency of spaces within it will have a major impact on the ability of the ventilation system to achieve the client’s requirements. All new major projects are required to use building information modelling (BIM) in order to ensure a coordinated design and provide information for the subsequent operation and possible future development of the facility.

Health Technical Memorandum 03- 01 Parts A and B need to be read and considered in their entirety when specifying and designing ventilation systems to ensure that the end result will comply with the client’s needs.

Ventilation Safety Group (VSG)

4.2 The Building Services Research and Information Association (BSRIA) has produced an approach to project delivery known as “Soft landings” (BSRIA, 2018). It aims to ensure that the client’s success criterion is kept in focus during the inception and briefing, design, construction, pre-handover, initial aftercare and extended aftercare phases of a project. It is strongly recommended that the client and project contractor adopt this approach.

4.4 The management of the ventilation systems of a healthcare provider should be overseen by a Ventilation Safety Group (VSG). The VSG should have clearly defined roles and responsibilities, be part of a healthcare organisation’s governance structure and report to the “Designated Person” at Board level. It should be led and

[HTM 03-01 A – PDF page 29]

4.0 The design and specification process

• annual verification and performance testing;

• prioritising the plant replacement programme;

chaired by a person who has appropriate management responsibility, knowledge, competence and experience (for example, the Designated Person). (See Chapter 2 in Part B of Health Technical Memeorandum 03-01 for further information.)

• decommissioning and removal of redundant equipment.

4.5 The VSG should be a multidisciplinary group and should typically comprise:

• an Authorising Engineer/independent adviser for ventilation (AE(V));

• an Infection Prevention and Control person;

• the Authorised Person(s) for ventilation services (AP(V));

• estates (operations and projects) staff;

Where estates and facilities provider services are part of a contract (including PFI), it is essential that these providers participate fully in all those aspects of estate and facilities management that can affect patients. This includes responding to specific requests from the VSG, which may be in addition to relevant guidance and documentation.

• clinicians and specialist departments (for example, theatres, critical care areas, pharmacy, medical microbiology, nursing, decontamination);

• personnel from the finance department with accountability for capital and revenue evaluation;

• other stakeholders as appropriate;

4.7 It is important that decisions affecting the resilience, safety and integrity of the ventilation systems and associated equipment are not taken without the agreement of the VSG. The VSG should ensure that appropriate expertise and competence is available when making such decisions.

• coopted expertise (for example, ventilation designers, consultants and suppliers).

4.6 The VSG remit should be to assess all aspects of ventilation safety and resilience required for the safe development and operation of healthcare premises. It should inform the following areas:

4.8 Whenever significant building work is undertaken, the VSG should consider its effects on the existing ventilation system air intakes. These may need to be protected from airborne dust during construction by the fitting of temporary additional filtration. There will also be a need to identify any risks to construction personnel who may be working in the vicinity of extract air discharges.

• the design process for new healthcare premises;

• the design process for modifications to existing premises;

• the commissioning and validation process;

• operational management and maintenance;

4.9 When construction or alteration work is undertaken inside an occupied building, its effects on the occupiers should be considered. The VSG should be consulted, and they may require that the area be sealed off from the occupied parts of the building and that a temporary extract be provided to maintain the worksite at a