HTM 03-01 A: _Hlk37000395 – Standard layout 3 – single-corridor conventional operating suite with “lay-up” prep / _Hlk37000395 – Standard layout 4 – single-corridor UCV operating suite with SPS prep
[HTM 03-01 A – PDF page 172]
Standard layout 3 – single-corridor conventional operating suite with “lay-up” prep
Room Size (m3)‡ Air-change rate (ac/h) Nominal pressure (Pa) Flow rate (m3/s)
Theatre
≥22 Primary = 0.73 From Prep = 0.28 Total = 1.01
Anaesthetic
Design 15
0.24
Commissioned ≥10
Lay-up prep ≥22 0.35**
Scrub * – –
Utility – –5 0.40
Notes:
‡ Derived from Health Building Note 10-01 (2021). If room sizes differ from those given, recalculate the design air flows to
achieve the air change rate or door protection.
* This is a separate scrub and is not considered as being part of the theatre volume.
** Interchange is not permitted between the theatre and lay-up prep; therefore, as in Appendix 5, an airflow protection of 0.28 + 0.07 closed-door airflow is required as a minimum (but see also the “designers’ notes” in Appendix 4).
The volume of air to be extracted from the theatre should be determined by subtracting the airflow required for protection at the key door from the total air entering the space. The balance should be equally divided between the passive or active extract locations.
The extracts within the theatre and scrub may be either passive and fitted with pressure stabilisers or active and connected to the extract system. They should where possible be located at low level and positioned to promote the active ventilation and scouring of all areas of the space (see paragraph 8.92). Air transfer from theatre to anaesthetic room may be by pressure stabiliser or transfer grilles (see paragraphs A8.51 and A8.52 in Appendix 8). The anaesthetic room extract will be at low level (see Appendix 9).
LLE
Scrub
KEY TO SYMBOLS
0.73
Supply volume (m3/s)
Operating theatre
0.24
Extract volume (m3/s)
Anaesthetic
≥22
0.24
Nominal room pressure (Pa)
LLE
Air change rate (ac/h)
–5
0.40
0.35
Pressure stabiliser
>20
Utility
Prep (lay up)
LLE
≥22
Low-level active extract or pressure stabiliser to assist air distribution in theatre
Exit bay
Transfer grille
[HTM 03-01 A – PDF page 173]
Appendix 7: Operating suite design logic
Standard layout 4 – single-corridor UCV operating suite with SPS prep
Room Size (m3)‡ Air-change rate (ac/h) Nominal pressure (Pa) Flow rate (m3/s)
Theatre ≥22 #1.01
Anaesthetic
Design 15
0.24
Commissioned ≥10
Sterile pack store prep 0.10
Scrub * – –
Utility – –5 0.4
Notes:
‡ Derived from Health Building Note 10-01 (2021). If room sizes differ from those given, recalculate the design air flows to achieve the air change rate or door protection.
* This is a separate scrub and is not considered as being part of the theatre volume.
# Primary fresh-air volume for the UCV canopy or ≥22 ac/h or door protection
The volume of air to be extracted from the theatre should be determined by subtracting the airflow required for protection at the key door from the total air entering the theatre space. The balance should be equally divided between the passive or active extract locations.
The extracts within the theatre and scrub may be either passive and fitted with pressure stabilisers or active and connected to the extract system. They should where possible be located at low level and positioned to promote the active ventilation and scouring of all areas of the space (see paragraph 8.92). Air transfer from theatre to anaesthetic room may be by pressure stabiliser or transfer grilles (see paragraphs A8.51 and A8.52 in Appendix 8). The anaesthetic room extract will be at low level (see Appendix 9).
LLE
UCV operating theatre Scrub
KEY TO SYMBOLS
1.01
Supply volume (m3/s)
0.24
UCV primary air flow rate (m/s)
Extract volume (m3/s)
Anaesthetic
0.24
Nominal room pressure (Pa)
≥22
LLE
Air change rate (ac/h)
–5
0.40
Pressure stabiliser
>20
0.10
Utility
Prep (SPS)
LLE
Low-level active extract or pressure stabiliser to assist air distribution in theatre
Exit bay
Transfer grille