HTM 03-01 A: _Hlk37000395 – Building construction factors
[HTM 03-01 A – PDF page 51]
7.0 Environmental control
7.0 Environmental control
Building construction factors
together with that recovered by the energy- recovery device. This will provide a useful check on overall operating efficiency and provide evidence that energy targets are being achieved. The provision of movement sensors within the controlled space in order to determine the actual occupancy will facilitate this process.
7.1 The primary objective of a ventilation control system is to keep the space served within the required environmental control limits, at the appropriate times – regardless of external conditions or internal loads – and with the minimum energy consumption.
7.5 The failure of ventilation systems serving critical areas can have grave consequences for the delivery of healthcare. Control systems should therefore be simple, robust and reliable.
7.2 The building heating load will normally be met by a wet heating system with ventilation provided to suit the activities within it. The control of the heating system will normally be compensated to the outside air temperature. Control of the ventilation will usually be via a building management system (BMS) with “outstations” in individual plantrooms and/ or for individual AHUs.
7.6 Computer-software-driven control systems are now the norm in building services. However, healthcare ventilation systems need to be available for operation outside of normal working periods when software support is not available. Should the software fail, it will be left to site staff, who may have little knowledge of the control algorithms, to restart the ventilation system. It is therefore essential to ensure that a simple means of restarting critical systems in the event of a software failure is provided (see also Chapter 9).
7.7 Where BMS use “outstations” to control plant, the “outstation” should be independently able to control the plant if the BMS link is lost.
7.3 A BMS incorporating self-adaptive control algorithms that automatically adjust the set-point to suit the usage and load is preferred. This will enable the operating conditions and control tolerances to be set and monitored. It is often not possible to accurately predict building load variation at the design stage. Information provided by monitoring the operation of the plant via a BMS will enable optimum set-points to be established and energy consumption reduced.
7.4 The BMS may also be set to log the actual energy consumed by the system
[HTM 03-01 A – PDF page 52]
Location of controls
7.8 Whether within the plant, duct or room, sensors should be located to provide accurate measurement of the condition of the air being monitored.
condition, the ventilation output may be reduced by “setting back” the system (see paragraph 6.2 and associated Note). This will significantly reduce energy consumption and extend the life of filters and other system components.
Multi-zone control methods and application
7.9 Sensors and control items such as control valves should be located close to the element being sensed or plant item being controlled in order to minimise time lags within the system. These may create over- shoot of conditions beyond the design envelope and result in additional energy consumption.
7.13 Close control of all air-conditioning parameters may be difficult to achieve with multi-zone systems, since each zone will in theory require a reheater and humidifier to give total control of humidity, if that is what is required. In reality, such close control is rarely required. It is therefore usual with multi-zone systems to provide control of zonal temperature only, with humidity control, where fitted, being based on average conditions within all zones, or a minimum condition within one zone.
7.10 Where there is a requirement for close control of air-conditioning parameters in a number of zones (for example, an operating department), separate plant should be provided for each zone in order to avoid the need for expensive over-cooling and reheating of individual zones. The control of most multi-zone systems within healthcare premises is based on off-coil control within the central plant, with trimmer heater-batteries on individual zones.
7.14 Designers should consider whether it is necessary for the supply and extract fans to be interlocked – either so that the supply fan will not operate unless airflow is established within the extract system, or vice-versa depending on the required pressures within the rooms being served (see also Chapter 8).
In modern buildings the cooling load is often significantly greater than the heating load and may exist all year round. Whenever possible, the design should take advantage of free cooling when available.
7.15 The sequence switching of units in order to prevent transient reverse airflows will be particularly important in laboratories and pharmacies that contain fume cupboards, safety cabinets and other LEV systems.
Fire aspects
7.11 Facilities to start, set back and stop the plant should be provided in the plantroom. Remote start and set-back control and indication, if required, should be provided at a manned staff location (for example at the reception or staff base).
7.16 The control strategy for ventilation systems in the event of a fire should be set out in an agreed fire and smoke control strategy for the site (see Chapter 1).
7.12 Many ventilation systems may be completely shut down when the area served is not in active use (for example, operating suites). Alternatively, where there is a need to maintain a background
7.17 All supply AHUs should have a smoke sensor linked to the fire control panel and mounted in the main supply duct immediately downstream of the AHU. In