SHTM 03-01 Part A: 9. Equipment Selection Factors – Supply AHUs and associated extract units (pages 101–108)
[SHTM 03-01 Part A – PDF page 101]
device will now provide the frost protection. Where an energy-recovery device is fitted, the frost coil will be replaced by a fog coil.
Where steam coils are used for a fog or frost coil, they may be constructed using spiral finned copper tube. As they will be prone to fouling, the tube layout and spacing should permit easy access for regular cleaning.
Main and branch heater-batteries should be constructed of solid drawn copper tube coils with copper fins, generally connected in parallel. In coastal and particularly exposed areas the client may require an anti-corrosion treatment.
Where there is a wet heating system in the areas served, the main heater-battery should be sized, in conjunction with the energy-recovery device, for the ventilation requirements only and not for the building fabric loss. Ventilation should only be used for heating the building fabric if the room specification precludes the use of heat emitters and it is not within the heated volume of the building (for example, a cleanroom or operating theatre with external walls).
Access for cleaning will be provided to both sides of all fog coils and heater- batteries.
Main heater-batteries may be water or steam. Electric heaters are expensive to operate, and their efficiency is particularly dependent on the air velocity through them. Their use should be restricted to branch trimming control.
Where steam supplied heater- batteries are used, their control, venting and trapping systems should be designed so that a vacuum cannot occur within the coil. The condensate drainage arrangements should not allow pressure to build in the condensate main as this will result in a back-up of condensate in the battery.
Where possible, wet trimmer heater- batteries should be located in plant areas.
Where it is necessary to locate heater- batteries in false ceilings etc, consideration should be given to the use of electric heaters (note that additional fire detection may be required). If this is not practicable and a LPHW system is used, a drip-tray should be installed under the control valve assembly to protect the ceiling. A moisture sensor and alarm should be fitted in the tray. In any event, to facilitate maintenance access, they should be located above corridors or other non-clinical areas and never above patient-occupied spaces
Auxiliary fan coil units are not to be installed in the ceiling above a patient- occupied space. They should be accessible for routine maintenance and cleaning without the need to cause significant disruption to the operation of the area that they serve.
Cooling coils and drift eliminators
Cooling coils supplied with chilled water are the preferred option. For small loads, or where chilled water cannot be made available, direct expansion (DX) coils may be used.
Note: For DX coils, it may be necessary to divide the chiller circuits unevenly in order to achieve efficient operation under part-load conditions. The turn- down ratio should allow stable control down to 10% of the peak load.
[SHTM 03-01 Part A – PDF page 102]
Cooling coils should be periodically decontaminated so the fin spacing needs to be ≥2.5 mm and the fins rigid enough to withstand cleaning (for example, ≥0.25 mm thick). Hinged access doors with viewing ports and illumination inside the AHU or duct should be provided both sides of the coil.
In an AHU when the cooling-coil face velocity is greater than 2 m/s a drift eliminator will be required downstream of the coil. The eliminator will be an entirely separate device mounted on slide rails so that it can be easily removed without the need for tools. If the size of the AHUs precludes the use of slide rails, and the eliminator is constructed in sections which maintenance personnel will have to enter the unit to remove, each section should have lifting handles. In order to reduce the use of plastics, alternative materials should be considered for the eliminator elements.
Note: For small DX coils and in fan coil units, the eliminator may take the form of a joggled extension of the fins.
All cooling coils are to be fitted with their own independent drainage system as specified in paragraph 9.105 onwards. A baffle or similar device should be provided in the drip-tray to prevent air bypassing the coil. The tray should be large enough to capture the moisture from the coil headers and drift eliminator.
Where coils are greater than 1.8 m high and the air velocity is >2 m/s, either intermediate drip-trays will be required or the fin spacing should be increased to ≥3 mm.
In order to minimise electrolytic action resulting from condensation on the air side, cooling coils constructed from copper tubes with copper fins and electro- tinned after manufacture are preferred. Aluminium fins should only be used if vinyl- coated.
All parts of the coil and its associated ductwork in contact with moisture will be manufactured from corrosion-resistant materials. Pressed steel coil headers, even if treated, have been shown to be prone to corrosion over time and should not be used. Steel mounting frames and casings present similar problems so stainless steel is preferred.
Where a cooling coil has to be located above a ceiling, a drip-tray should be installed under the battery and control valve assembly to protect the ceiling from leaks and condensation drips. A moisture sensor and alarm should be fitted in the tray. To facilitate maintenance access, they should be located above corridors or other non- clinical areas and never above patient- occupied spaces. The air velocity should be below 2 m/s to avoid the need for a drift eliminator. All drainage piping should be rigid type not flexible hose.
Auxiliary fan coil units should not be installed in the ceiling above an occupied space. They should be accessible for routine maintenance and cleaning without the need to cause significant disruption to the operation of the department that they serve. The drainage of such items is often problematic. If a suitable fall in the drain line cannot be achieved, a pump out system should be provided. Drainage piping should be rigid type (not flexible hose).
[SHTM 03-01 Part A – PDF page 103]
Humidifiers
Humidification was originally required for some healthcare applications in order to control the risk associated with the use of flammable anaesthetic gases. The use of such gases has now ceased. Humidification is therefore no longer required unless there is a very specific application requirement (see Chapter 8 and associated SHPNs/HBNs).
Note: In an operating theatre, if high humidity is required to help prevent tissue drying during surgery, it should be provided when required using sterile water in a disposable nebuliser driven by medical air, and not from a humidifier installed in the ventilation system. In that way the quality of the moisture delivered will be assured.
If it is unclear at design stage whether humidification is required, provision for retrofitting in terms of space provision and a capped drainage system may be provided either in the AHU or in a zone branch duct. The need for such provision and the amount of space allowed for it should be agreed in writing with the client.
If a humidifier is required, the manufacturer’s instructions regarding selection, capacity, installation and control need to be followed. Incorrectly sized, installed or operated humidifiers can become a source of fungal and microbiological contamination within a ventilation system. This may result in a significant airborne infection risk to patients and staff.
Only steam injection manifold-type humidifiers are considered suitable for use in health building air-conditioning systems. The injected steam will be generated locally either by mains steam or electricity, within or adjacent to the humidifier. Water- curtain, water mist or spray humidifiers of any type cannot be used.
Note: Jacketed lance mains steam humidifiers will always be a source of heat within the system during the cooling season unless completely isolated when not required.
All parts of the humidifier and its associated ductwork in contact with moisture should be manufactured from corrosion-resistant materials. Stainless steel is preferred.
For self- and locally-generated steam humidifiers, the cleanliness of the water supply is essential for their safe operation. The water supply should be derived from a wholesome source or demineralised supply. Chemical treatments cannot be added to the water supply to humidifier units. The electrodes of self-generating electrode boiler-type humidifiers should be stainless steel.
If the quality of the water supply to a self-generating humidifier unit cannot be assured, an ultraviolet (UV) system to control microbiological growth may be installed. However, given the limitations of UV systems, this will require high-quality water filtration to ensure the effectiveness of exposure of organisms to the UV irradiation. As with all water treatment systems the unit should be of proven efficacy and incorporate UV monitors so that any loss of transmission can be detected.
Provision should be made for draining down supply pipework and break tanks for periodic disinfection and cleaning during the seasons when they are not required in service. The humidifier branch water supply isolation valve will be located at the junction with the “running” main to prevent the creation of a dead leg. All parts of the system should be capable of being cleaned or disinfected as necessary. Hinged
[SHTM 03-01 Part A – PDF page 104]
access doors with viewing ports and internal illumination should be provided. A label warning that the device emits live steam and should be isolated prior to opening should be affixed to the access door.
A zone humidifier, if required, may be installed in a supply branch. The ductwork in which the humidifier is mounted and for at least 1 m downstream should be stainless steel.
All humidifiers wherever installed will be fitted with their own independent drainage systems as detailed in paragraph 9.105 onwards and be completely accessible for cleaning.
Drainage
All items of plant wherever located that could produce moisture should be provided with a drainage system. The system will comprise a drip-tray, glass trap, air break and associated drainage pipework.
The drip-tray should be constructed of a corrosion-resistant material (stainless steel is preferred) and be so arranged that it will completely drain. To prevent “pooling”, it is essential that the drain connection should not have an up-stand; and that a slope of approximately 1 in 20 in all directions should be incorporated into the drain outlet position.
In AHUs that have access doors large enough for a person to enter, the drip-tray should be easily accessible for inspection and cleaning.
In AHUs with access doors too small for a person to enter, the complete drip- tray should be capable of being withdrawn. It should be clamped into the AHU with thumb screws so that it can be removed without the need for tools (see photograph).
Figure 7 Removable AHU drainage tray
Each drip-tray should be provided with its own drain trap. The drain trap should be of the clear (borosilicate) glass type. This permits the colour of the water seal to be observed, thus giving an early indication of corrosion, biological activity or contamination within the duct. The trap should have a means for filling and incorporate couplings to facilitate removal for cleaning. It should be located in an easily visible position where it will not be subject to casual knocks. The pipework connecting the drainage tray to the trap should have a continuous fall of not less than 1 in 20.
[SHTM 03-01 Part A – PDF page 105]
Traps fitted to plant located outside or in unheated plant rooms need to be trace heated in winter. The trace heating should not raise the temperature of water in the trap above 5ºC.
Water from each trap will discharge directly via a clear air gap of at least 15 mm above the unrestricted spill-over level of either an open tundish connected to a foul drainage stack via a second trap, or a floor gully (or channel). A support should be provided to ensure that the air gap cannot be reduced. More than one drain trap may discharge into the tundish providing each has its own air-break.
Drainage pipework from the tundish may be thermoplastic, copper or stainless steel. Glass should not be used. The pipework should be a minimum diameter of 22 mm and have a fall of at least 1 in 60 in the direction of flow. It should be well- supported and located so as not to inhibit access to the AHU.
Note: In the case of fan coil units, the glass trap and air-break may be omitted and a pump out system fitted. The unit drainage should connect to the main drainage system via a waterless trap that does not allow discharged water to return. The drainage tray itself will be easily removable for routine inspection and cleaning.
Attenuators
Provided care is taken in the design and construction of low pressure systems to avoid significant noise generation in the ductwork, attenuation should only be needed to absorb fan noise
Fans radiate noise through both the inlet and outlet connections, and it may be necessary to provide attenuation to limit the noise from both of these connections. It is always preferable and more economic to control noise and vibration at source, or as close to source as possible. It should be noted that attenuators offer a resistance to airflow and by causing turbulence can be the cause of regenerated noise in a system.
A thorough assessment of the design should be made to assess the potential noise problems. It should consider the following factors:
fan and plant noise generation;
airflow-generated noise in ductwork fittings and dampers;
noise generated at grilles, diffusers and other terminals;
noise break-in and break-out of ductwork;
cross-talk and similar interference;
the noise limitations for the building and surrounding areas;
external noise generation.
A method of assessment of these factors and the sound attenuation requirements of ductwork systems is given in CIBSE Guide B
Note: Attenuators fitted in distribution ducts can themselves become a source of regenerative noise if the air velocity through them exceeds their tested performance value.
[SHTM 03-01 Part A – PDF page 106]
Attenuator units with a sound- absorbing in-fill suitable for the quality of air being handled and protected by a perforated sheet metal casing are the preferred option. Absorption of moisture, dirt and corrosive substances into the “in- fill” and the release of fibrous particles into the airstream should be prevented using a membrane with a declared service life of at least 25 years. If these conditions can be met, the attenuator may be located in the supply ductwork downstream of the final filter. Cleaning access should be provided at both ends of the unit.
Sound-absorbing material should not be applied to the inside surface of a duct.
End of line mixing and VAV boxes may be supplied lined internally with sound- absorbing material. The material will be non-particle-shedding, protected from casual damage during maintenance and be fire-resistant.
See paragraph 9.149 onwards for guidance on distribution and point of use noise control.
Note: Developments in “dynamic attenuation” may replace the more traditional physical attenuators and overcome noise “break in” and point of use noise regeneration issues.
Recirculation – minimum fresh air requirement
Where return air is recirculated, fresh air should be introduced equivalent to at least 20% of the supply air volume, or that required by the Building Regulations, or at least 10L/s/person, whichever is greater.
Distribution system
The CIBSE guide B2 provides the standard design Information for ventilation systems, their ductwork and terminal devices. The guidance in this SHTM highlights the specific factors that are required for or excluded from healthcare ventilation installations.
For normal applications in healthcare buildings, low velocity systems are recommended; velocities below 2 m/s are unlikely to be justified.
The site will often dictate the main routing of ductwork systems, as will the location of the AHU relative to the load. Grouping AHUs in centralised plantrooms results in large vertical service shafts and long main duct runs. Decentralising AHUs into service spaces adjacent to the load results in a more compact duct layout.
Whichever option is chosen, the design should seek to make the layout as symmetrical as possible; that is, the pressure loss in each branch should be as nearly equal as possible. This will aid balancing and may reduce the number and variety of duct fittings that are needed.
Main distribution ductwork should not be routed above sleeping areas. Where there is no alternative route, additional external acoustic insulation may be required.
Where auxiliary air-conditioning units, fans, filters or trimming devices are installed in the distribution system, they will be independently supported and fitted with a suitable drainage system where appropriate. If they are a source of vibration, they should be linked to the distribution ductwork via flexible connections.
[SHTM 03-01 Part A – PDF page 107]
Ductwork materials and construction
The choice of duct material should take account of the nature of the air or gas being conveyed and the environment in which the duct will be placed.
Galvanised sheet steel is suitable for normal ventilating and air-conditioning applications. Its inherent mechanical strength renders it resistant to casual damage both during the construction phase and throughout its service life when mechanical and electrical services around it are accessed. It may also readily withstand the impacts sustained when rotary equipment is used to clean it internally.
In instances where moisture levels and/or corrosive elements in the air being conveyed are very high, aluminium, stainless steel, PVC or GRP ducts should be used. Stainless or black steel are the only suitable materials for high temperature ductwork.
Where other ductwork materials are considered, care should be taken to ensure that the material is satisfactory for the application having regard to the likely service life, possibility of mechanical damage and performance in the event of a fire. Where used it will be installed strictly in accordance with its manufacturer’s instructions.
9.131` Rectangular ducting with an aspect ratio of 1:1 is preferred but ratios of up to 3:1 are acceptable where there are space constraints. Circular spiral-wound or flat- oval are also acceptable providing they meet the leakage standard when tested (see Note after paragraph 9.136). Flexible ductwork is not suitable for air distribution in healthcare applications. In situations where solid ductwork cannot be used, flexible ductwork may be used to make the final connection to a terminal providing it does not exceed 0.5 m in length, is extended as far as possible and is never used in lieu of a bend (see paragraph 9.160).
The inside of the ductwork should be free from structural projections and as smooth as possible. Flanged gasketed joints between sections are preferred for rectangular ductwork, blind-riveted mastic- sealed slip-joints for circular and flat-oval.
In inherently wet areas, such as the base of fresh air inlet ducts and some extract systems, the ductwork may require draining to prevent a build-up of standing water. The layout of the drains should be as specified in paragraph 9.105 onwards.
Where builders’ work plenum chambers or ducts are employed, all internal surfaces should have a smooth finish and be sealed to prevent dust shedding.
All types of ductwork should be manufactured and installed to the appropriate current BESA specification.
Ductwork should be supported with threaded rod and channel. Note that sheet metal ductwork cannot use bolt-through supports. Gripple wire may only be used for circular galvanised spiral-wound or flat-oval ductwork.
Note: All installed ductwork whether new or reused should be subject to a leakage test on site prior to the application of any insulation. The leakage test will be to BESA DW144 but with a permissible leakage rate of not greater than 3%.
[SHTM 03-01 Part A – PDF page 108]
Fire aspects: damper types and locations
It is essential that all relevant fire aspects of ducting systems are agreed with the fire officer before the design is finalised (see paragraph 1.15 onwards).
Ductwork will be fire-stopped where it penetrates fire compartment walls, floors and enclosures, cavity barriers and subcompartment walls or enclosures, and provided with weatherproof collars where roofs or external walls are penetrated.
Fire and smoke dampers should be provided at the locations required by the Health Technical Memorandum 05 series of documents. The damper mounting frame should be securely attached to the building fabric strictly in accordance with the manufacturer’s tested details. Where a fire and smoke damper is not mounted directly in a fire compartment wall, it must be correctly supported and the ductwork between it and the fire wall must possess the same fire rating as the fire wall that it penetrates. The fire-rated portion of ductwork must not be penetrated by test holes or inspection hatches (see also BESA DW145).
Any non-standard fire duct or damper arrangement should be agreed in writing by the client’s fire advisor and subsequently tested and signed off by the installer.
An access hatch should be provided adjacent to each fire and smoke damper so that its correct operation can be directly observed. The hatch will be as large as necessary to permit inspection, testing and maintenance. The damper test switch should be mounted adjacent to the inspection hatch so that the routine test and visual confirmation of the damper operation can be carried out by a single person. For circular ductwork, rectangular saddle mounted hatches should be fitted (see BESA DW144).
Smoke-diverting dampers will be provided on recirculation air systems to automatically divert any smoke-contaminated return air to the outside of the building in the event of a fire. It should be arranged so that the normally open diverting damper in the return air branch to the input unit closes and all the return air is exhausted to outside (see paragraph 5.53 onwards).
Duct sections
When sizing ductwork, the designer should consult the CIBSE B2 guide.
All fittings should conform to the current BESA specification. Wherever possible, long radius bends, large radius main branches, not more than 45º angle sub-branches and long taper transformations should be used.
Bad design in relation to airflow can lead to vibration of flat duct surfaces, an increase in duct-generated noise, pressure loss in ductwork, unpredictable behaviour in branch fittings and terminals, and adverse effects on the performance of installed plant items, such as trimmer batteries.
Thermal insulation
In order to reduce energy consumption, achieve efficient energy recovery and prevent condensation in service voids, all supply and return air ductwork should be thermally insulated. Insulated ductwork runs outdoors should be weatherproofed.