SHTM 03-01 Part A: 9. Equipment Selection Factors – General requirements

Ventilation for Healthcare - Design and validation (SHTM 03-01 Part A) · PDF pages 88–92 of 227 · Source file: shtm-03-01-part-a-v30-feb-2022.pdf
Unofficial text extract. Tables and figures may be incomplete. Authoritative version: official PDF from NHS National Services Scotland.

[SHTM 03-01 Part A – PDF page 88]

9. Equipment Selection Factors

General requirements

The following gives detailed guidance on the design and selection of ventilation equipment, the distribution system, terminals and control aspects. Designers should take note of the supporting information given in Chapters 10 and 12. Failure at the design stage to make due allowance for the standards to be achieved may mean that the installed ventilation system will not be acceptable to the client’s validator at handover.

Location and access

The plant should be located so that it is remote from possible sources of contamination, heat gains and adverse weather conditions. The design should ensure that wind speed and direction have a minimal effect on plant throughput.

Safe access to and around plant is essential to facilitate inspection, routine maintenance, repair and plant replacement.

Air-handling units (AHUs) should be located in an accessible area secured from unauthorised entry. They may be grouped together in dedicated plantrooms or distributed around the building with AHUs located adjacent to or within the area that they serve. In the healthcare setting, because of the difficulty in gaining access for routine service and maintenance, mounting ventilation units of any type in ceiling voids above clinical spaces is not permitted.

Note: If it is proposed to install ventilation units of any type in a ceiling void above a non-clinical area, it should be subject to a formal risk assessment and its use being agreed by the ventilation safety group (VSG) prior to design approval. Their assessment will consider how the unit may be safely accessed and maintained.

AHUs should be located in purpose- built plantrooms or designated service spaces within a building. This will allow for routine service and maintenance (which is a statutory requirement) to be carried out at any time of day and regardless of weather conditions. It will also protect the plant from contamination by bird droppings, so reducing the risk of fungal spore contamination of the air supplied by the AHU. Control of pests and vermin will be simpler and while not in themselves a source of airborne contamination, their corpses can become a reservoir of biological material that may lead to insect infestations within the AHU.

Note: In a new building it is not envisaged that there will be any need to locate AHUs outside. The design of the building should incorporate central or distributed plant spaces of sufficient size to accommodate the plant required to service the building.

When refurbishing or changing the use of an existing building, plant space should be created to house the ventilation plant and other services. If located on a roof they should be enclosed in a plantroom with a safe means of access. If located at ground level they should be secured within a plantroom to prevent unauthorised access. Measures should be taken to exclude vehicles from the vicinity to ensure that exhaust fumes will not be drawn into intakes. Intakes for ground level AHUs should

[SHTM 03-01 Part A – PDF page 89]

be extended to a height and distance from contamination sources that allows them to draw in unvitiated air.

In the unlikely event that an internal or external plant room cannot be provided, and ventilation units have to be located outside, they should be fully weatherproof to IP65 and secured from unauthorised access. Protection against the elements should also be provided for personnel carrying out routine inspection and maintenance activities. As an example, when two units are outside, and they are installed with their access doors facing each other, if the gap between them is roofed over and the open ends capped, the AHUs themselves create what is in effect a plant room (see photographs).

Water will be used during routine cleaning or spilt when maintenance is being undertaken. The area around plant should be tanked to prevent water penetration to adjacent areas and adequately drained

Figure 5 AHU formed plant room (external)

Figure 6 AHU plant room (internal)

Note: Plant rooms should be provided with a sink so that glass drainage traps may be cleaned out and staff can wash their hands after handling contaminated/dirty filters. A source of domestic hot water (DHW) with a valved hose connection point will also be required so that AHUs can be washed out internally as part of their routine maintenance. Plant rooms at roof level should be served by a lift.

Fire precautions should be incorporated in accordance with the Health Technical Memorandum 05 Firecode series. Guidance is available in Chapter 1 of this document.

[SHTM 03-01 Part A – PDF page 90]

Combustion equipment cannot be located in a fire compartment that houses air handling equipment

Standard requirements

Identification and labelling

All ventilation systems should be clearly identified with a permanent (traffolyte type preferred) label in accordance with the requirements of Chapter 13. The label should identify both the AHU and the area that it serves. The lettering should be at least 100 mm high and be screwed or riveted onto the AHU in an easily visible place near the fan of the unit, adjacent to the local electrical isolator. Any subsystems and the principal branch ducts should be similarly labelled.

Note: The AHU identification code should conform to the plant identification system in use at the premises (see Chapter 13).

The nature of air and direction of flow should be clearly marked on all ducts using the symbols given in BS 1710.

All airflow test-points should be clearly identified with a permanent label and the design information given (for example, TPS 1 – Anaesthetic supply; 400 × 300; Design 185 L/s).

Plant minimum standards

Plant should comply with the minimum standards set out in Table 8.

External finish to be corrosion resistant and may be available in a variety of colours at no additional cost. This can aid identification by colour-coding of units in a plantroom (for example, green for general ventilation; blue for theatres; red for laboratories and isolation facilities; grey for extract).

Organic materials or substances that can support the growth of microorganisms cannot be used in the construction of the plant or its distribution system. The water fittings and materials directory list suitable materials for sealants and gaskets (see also BS 6920).

AHU internal wiring should comply with BS 7671 and be installed in a cable containment system providing suitable mechanical protection. The wiring and its containment system should not allow air bypass at the filters. The wiring, its containment system, connection boxes and fixings should permit the effective internal cleaning and inspection of the AHU.

Plastic-bladed dampers and plastic plate heat exchangers should not be fitted. This accords with the national policy to reduce the use of plastics.

Motorised spring-return low-leakage (BS EN 1751 class 3) isolation dampers should be located at the intake, supply, return air and discharge duct connections of an AHU and associated extract unit. They should be of the opposed-blade type and be fitted with end switches. They should close automatically in the event of power failure or plant shutdown to prevent any reversal of the system airflow. They will also function to isolate the plant from the distribution system when undertaking cleaning or maintenance.

[SHTM 03-01 Part A – PDF page 91]

Note: Internal plant dampers or provision for the fitting of shut-off plates, also known as dagger plates, between elements within an AHU are not required.

Access to elements that require routine service such as filters, fans and all types of heat-transfer device should be via hinged doors. In horizontal units the doors should be wide enough: 500 mm minimum at a unit height >1 m. For smaller units the doors need to be at least 600 mm wide, to allow easy access. Items requiring infrequent access such as attenuators may be via removable panels fitted with lifting handles, or access hatches. All doors and panels should be secured from casual access, close- fitting and without leaks.

Table 8: Plant minimum standards

Note: Capping projecting spire screws is not acceptable.

AHU Element Minimum Standard Notes Construction Double metal or composite skin with sandwiched insulation to “Euroclass A” fire rating Smooth internal surface without channels or ridges No projecting spire or tech screws inside the unit.

Internal surface finish Non-corrodible, washable and smooth and of a colour that allows accumulations of dirt to be easily seen

BS EN 1886 Class L2 Test at +700 Pa and –400 Pa

Stainless steel or white powder coated mild steel or with an equivalent protective treatment; but NOT surface galvanised Thermal transmittance BS EN 1886 Class T2 Manufacturer’s declaration Thermal bridge BS EN 1886 Class TB2 Manufacturer’s declaration Deflection BS EN 1886 Class D2 Manufacturer’s factory test Factory airtightness test – pre-delivery

BS EN 1751 C3 (low loss) Motorised opening and fitted with an end switch and spring return

Site airtightness test BS EN 1886 Class L2 +700/–400 Pa Filter frame bypass leakage BS EN 1886 Section 7 Supply and extract intake and discharge isolation dampers

Access doors Secured from casual access. Fan chamber doors to be fitted with a two-stage latch

EU 1253 – 2014

Key or similar device required to open access doors Door hinges should be adjustable to so that leakage can be eliminated on site Specific fan power -Internal (SFPint)

Current Eco design requirement for energy-related products (ErP)

UK Building Regs Part L2

Specific fan power - System (SFPsyst)

Energy recovery Current ErP EU 1253 Run-around coil – 68% Heat pipes – 73% Plate heat exchanger – 73% Thermal wheel – 73% Heat pump – EU 2281/201 Any other device – see standard All access doors should be fitted with seals and have adjustable hinges so that leakage can be eliminated once the unit is installed on site. Access doors to fan chambers should have a two-stage opening sequence to prevent the door blowing violently open if it is unlatched while there is still residual pressure in the unit.

[SHTM 03-01 Part A – PDF page 92]

Note: Providing the AHU is located in a plantroom or area secured from unauthorised entry, its access doors can only be opened with a key or similar device, the fan door is fitted with a viewing port and a two-stage opening latch and there is a fan electrical isolation switch adjacent to the fan-chamber access door, there is no requirement to fit an internal fan chamber mesh guard.

In the healthcare setting it can be difficult to turn off AHUs in order to inspect filters and drainage trays. Viewing ports and internal illumination will therefore facilitate routine inspection of such items. Viewing ports should be at a convenient height so that temporary ladders are not required. In double-stacked units the viewing ports in the upper section will be located in the lower portion of their access doors. Internal illumination should be provided by fittings to at least IP55 rating. Light fittings should be positioned inside the unit (not on the access doors) so that they provide illumination for both inspection and task lighting. All lights in a unit should be operated by a single switch and be powered independently of the AHU main switch. LED lights are preferred.

Access to air intakes and discharges, AHUs and items in the distribution system such as filters or auxiliary trimmer batteries located in a plantroom or plant area above 1.5m should be via platforms, fixed ladders, hook ladders, pulpit style movable steps or access platforms. The method of access chosen should reflect the frequency and nature of the maintenance requirement. The installation of distribution ductwork and other electrical or mechanical services should provide sufficient clearance to allow access equipment to be moved into position.

Chiller units: heat rejection devices

The design conditions given in Chapter 8 make no allowance for the elevated temperatures that can occur on the roof of buildings. Refrigeration condensers and chiller units should, if practicable, be shaded from direct solar radiation, or the design adjusted to take account of the gain. Care should be taken to ensure that there is sufficient clearance around the plant to allow effective air movement. Allowance may also be needed for the effect of walls, obstruction or other equipment in the area and for the prevailing wind direction.

Air-cooled condensers and/or dry coolers will always be the first choice for heat rejection from any refrigeration plant. The use of heat pump systems is also an option. Wet evaporative cooling systems cannot be used in healthcare premises unless limitations of space mean that they are the only way that the cooling load can be met. If they are used, national guidance on preventing and controlling Legionella should be closely followed (see the Health and Safety Executive’s (HSE) Approved Code of Practice and guidance document HSG274 ‘Legionnaires’ disease: the control of Legionella bacteria in water systems’).

Traditional refrigerants are being phased down and some of their replacements at the time of writing have a degree of flammability. The level of risk this poses should be formally addressed at the design stage and agreed with the client or their fire safety representative. The selection of a refrigerant should be made with reference to the F- Gas Regulations and should take account of the life expectancy of the plant versus the future availability and increasing cost of the refrigerant. Ultimately, choosing refrigerants with the lowest global warming potential is the ideal and will ensure that