SHTM 03-01 Part A: Appendix 7: Operating suite design logic

Ventilation for Healthcare - Design and validation (SHTM 03-01 Part A) · PDF pages 175–186 of 227 · Source file: shtm-03-01-part-a-v30-feb-2022.pdf
Unofficial text extract. Tables and figures may be incomplete. Authoritative version: official PDF from NHS National Services Scotland.

[SHTM 03-01 Part A – PDF page 175]

Appendix 7: Operating suite design logic

Figure A5 Operating suite design logic

[SHTM 03-01 Part A – PDF page 176]

Standard layout 1 – Two-corridor conventional operating suite with “lay-up” prep

Table A6 Two corridor conventional operating suite with “lay up” prep design criteria

Room Size (m3)‡ Air-change

Nominal pressure (Pa) Flow rate (m3/s)

rate (ac/h)

Theatre

165

≥22

25

Primary = 0.73 From Prep = 0.28 Total =

Anaesthetic

Design 15

57

15

Commissioned ≥10

Lay-up prep 36 ≥22 35 0.28**

Scrub * – 25 –

Notes:

‡ Derived from Health Building Note 10-01 (2021). If room sizes differ from those given, recalculate the design air flows to achieve the air change rate or door protection.

*This is a separate scrub and is not considered as being part of the theatre volume.

**Interchange is not permitted between the theatre and lay-up prep; therefore, as in Appendix 5, an airflow protection of

0.28 m3/s is required as a minimum (but see also the “designers’ notes” in Appendix 4).

N.B.If the lay-up prep also has a door or hatch to the corridor, its supply airflow volume would increase to 0.35 m3/s

The volume of air to be extracted from the theatre should be determined by subtracting the airflow required for door protection at the key door from the total air entering the space. The balance should be equally divided between the passive or active extract locations.

The extracts within the theatre and scrub may be either passive and fitted with pressure stabilisers or active and connected to the extract system. They should where possible be located at low level and positioned to promote the active ventilation and scouring of all areas of the space (see paragraph 8.92). Air transfer from theatre to anaesthetic room may be by pressure stabiliser or transfer grilles (see paragraphs A8.51 and A8.52 in Appendix 8). The anaesthetic room extract will be at low level (see Appendix 9).

[SHTM 03-01 Part A – PDF page 177]

Figure A6 Two corridor conventional operating suite with “lay up” prep, schematic layout

Standard layout 2 – two-corridor UCV operating suite with SPS prep

Table A7 Two corridor UCV operating suite with SPS design criteria

Room Size (m3)‡ Air-change rate

Nominal pressure

Flow rate (m3/s)

(ac/h)

(Pa)

Theatre 165 ≥22 25 # 1.01

Anaesthetic

Design 15

57

15

Commissioned ≥10

36 10 25

Sterile pack store prep

Scrub * – 25 –

Notes:

‡ Derived from Health Building Note 10-01 (2021). If room sizes differ from those given, recalculate the design air flows to achieve the air change rate or door protection.

* This is a separate scrub and is not considered as being part of theatre volume.

# Primary fresh-air volume to UCV canopy only or ≥22 or door protection

The volume of air to be extracted from the theatre should be determined by subtracting the airflow required for door protection at the key door from the total air entering the space. The balance should be equally divided between the passive or active extract locations.

The extracts within the theatre and scrub may be either passive and fitted with pressure stabilisers or active and connected to the extract system. They should where possible be located at low level and positioned to promote the active ventilation and scouring of all areas of the space (see paragraph 8.92). Air transfer from theatre to anaesthetic room may be by pressure stabiliser or transfer grilles (see

[SHTM 03-01 Part A – PDF page 178]

paragraphs A8.51 and A8.52 in Appendix 8). The anaesthetic room extract will be at low level (see Appendix 9).

Figure A7 Two corridor UCV operating suite with SPS schematic layout

Standard layout 3 – single-corridor conventional operating suite with “lay-up” prep

Table A8 Single corridor conventional operating suite with “lay up” prep design criteria

Room Size (m3)‡ Air-change rate

Nominal pressure

Flow rate

(ac/h)

(Pa)

(m3/s) Theatre

165

≥22

25

Primary = 0.73 From Prep = 0.28 Total =

Anaesthetic

Design 15

57

15

Commissioned ≥10

Lay-up prep 36 ≥22 35 0.35**

Scrub * – 25 –

Utility 36 – –5

Notes:

‡ Derived from Health Building Note 10-01 (2021). If room sizes differ from those given, recalculate the design air flows to achieve the air change rate or door protection.

* This is a separate scrub and is not considered as being part of the theatre volume.

** Interchange is not permitted between the theatre and lay-up prep; therefore, as in Appendix 5, an airflow protection of 0.28

[SHTM 03-01 Part A – PDF page 179]

+ 0.07 closed-door airflow is required as a minimum (but see also the “designers’ notes” in Appendix 4).

The volume of air to be extracted from the theatre should be determined by subtracting the airflow required for protection at the key door from the total air entering the space. The balance should be equally divided between the passive or active extract locations.

The extracts within the theatre and scrub may be either passive and fitted with pressure stabilisers or active and connected to the extract system. They should where possible be located at low level and positioned to promote the active ventilation and scouring of all areas of the space (see paragraph 8.92). Air transfer from theatre to anaesthetic room may be by pressure stabiliser or transfer grilles (see paragraphs A8.51 and A8.52 in Appendix 8). The anaesthetic room extract will be at low level (see Appendix 9).

Figure A8 Single corridor conventional operating suite with “lay up” prep schematic layout

Standard layout 4 – single-corridor UCV operating suite with Lay-up prep

Table A9 single-corridor UCV operating suite with Lay-up prep design criteria

Room Size (m3)‡ Air-change rate

Nominal pressure

Flow rate (m3/s)

(ac/h)

(Pa)

Theatre 165 ≥22 25 #1.01

Anaesthetic

Design 15

57

15

Commissioned ≥10

36 ≥22 35 0.35**

Sterile pack store prep

Scrub * – 25 –

Utility 36 – –5

[SHTM 03-01 Part A – PDF page 180]

Notes:

‡ Derived from Health Building Note 10-01 (2021). If room sizes differ from those given, recalculate the design air flows to achieve the air change rate or door protection.

* This is a separate scrub and is not considered as being part of the theatre volume.

** Interchange is not permitted between the theatre and lay-up prep; therefore, as in Appendix 5, an airflow protection of 0.28

+ 0.07 closed-door airflow is required as a minimum (but see also the “designers’ notes” in Appendix 4).

# Primary fresh-air volume for the UCV canopy or ≥22 ac/h or door protection

The volume of air to be extracted from the theatre should be determined by subtracting the airflow required for protection at the key door from the total air entering the theatre space. The balance should be equally divided between the passive or active extract locations.

The extracts within the theatre and scrub may be either passive and fitted with pressure stabilisers or active and connected to the extract system. They should where possible be located at low level and positioned to promote the active ventilation and scouring of all areas of the space (see paragraph 8.92). Air transfer from theatre to anaesthetic room may be by pressure stabiliser or transfer grilles (see paragraphs A8.51 and A8.52 in Appendix 8). The anaesthetic room extract will be at low level (see Appendix 9).

Figure A9 single-corridor UCV operating suite with Lay-up prep schematic layout

LLE

UCV operating theatre

KEY TO SYMBOLS

Scrub

Supply Volume (mᶟ/s)

Extract Volume (mᶟ/s)

15

UCV primary air flow rate (mᶟ/s)

Anaesthetic

Nominal Room pressure (Pa)

15

Air change rate (ac/h)

>22 25

Pressure stabiliser

-5

>20

Utility

LLE

Prep (Lay up)

Low-level active extract or pressure stabiliser to assist air distribution in theatre

>22

35

0 Exit Bay

Transfer grille

[SHTM 03-01 Part A – PDF page 181]

Standard layout 5 – (ex SHTM 2025 Plan 1b): single-corridor conventional operating suite with “lay-up” prep

Note: This layout and data is for historical purposes only. The information is to be used for the evaluation of existing systems, the fitting out of existing shell schemes or rebalancing of such systems following cleaning.

Table A10 (ex SHTM 2025 Plan 1b): single-corridor conventional operating suite with “lay-up”

prep design criteria

Room Size Air-change rate

Flow rate (m3/s)

(ac/h)

Nominal pressure (Pa)

Theatre * See Notes below ≥22 25 # See Notes below

Anaesthetic * See Notes below

Design 15

15

~ Supply and extract to achieve the air change rate

Commissioned ≥10

Lay-up prep * See Notes below ≥22 35 0.35**

Scrub * See Notes below – 25 –

Utility * See Notes below >20 –5

Notes:

* Existing theatre suite rooms to be measured on site

# Total airflow related to volume of theatre to give ≥22 ac/h or door protection value = primary theatre supply + 0.28 m3/s from the Lay-up Prep pressure stabiliser

** See the “designers’ notes” in Appendices 4 and 5.

The utility layout design figures will remain the same if a hatch is fitted instead of a door onto the service corridor.

The extracts within the theatre and scrub may be either passive and fitted with pressure stabilisers or active and connected to the extract system. They should where possible be located at low level and positioned to promote the active ventilation and scouring of all areas of the space (see paragraph 8.92). Air transfer from theatre to anaesthetic room may be by pressure stabiliser or transfer grilles (see paragraphs A8.51 and A8.52 in Appendix 8). The anaesthetic room extract will be at low level (see Appendix 9).

[SHTM 03-01 Part A – PDF page 182]

Figure A10 (ex SHTM 2025 Plan 1b): single-corridor conventional operating suite with “lay-up”

prep schematic layout

Standard layout 6 – (ex SHTM 2025 Plan 1a): single-corridor UCV operating suite with SPS prep

Note: This layout and data is for historical purposes only. The information is to be used for the evaluation of existing systems, the fitting out of existing shell schemes or rebalancing of such systems following cleaning. If difficulties are experienced with entrainment around the periphery of the UCV, adding a low-level active or passive extract in the location indicated will usually resolve the problem.

Table A11 (ex SHTM 2025 Plan 1a): single-corridor UCV operating suite with SPS prep design

criteria

Room Size Air-change rate

Flow rate (m3/s)

(ac/h)

Nominal pressure (Pa)

Theatre * See Notes below ≥22 25 # See Notes below

Anaesthetic * See Notes below

Design 15

15

~ Supply and extract to achieve the air change rate

Commissioned ≥10

* See Notes below 10 25

Sterile pack store prep

Scrub * See Notes below – 25 –

Utility * See Notes below – –5

Notes:

* Existing theatre suite to be measured on site

# Theatre total airflow related to volume of theatre to give ≥22 ac/h or door protection value

The utility layout design figures will remain the same if a hatch is fitted instead of a door onto the service corridor.

[SHTM 03-01 Part A – PDF page 183]

The extracts within the theatre and scrub may be either passive and fitted with pressure stabilisers or active and connected to the extract system. They should where possible be located at low level and positioned to promote the active ventilation and scouring of all areas of the space (see paragraph 8.92). Air transfer from theatre to anaesthetic room may be by pressure stabiliser or transfer grilles (see paragraphs A8.51 and A8.52 in Appendix 8). The anaesthetic room extract will be at low level (see Appendix 9).

Figure A11 (ex SHTM 2025 Plan 1a): single-corridor UCV operating suite with SPS prep

schematic layout

Standard layout 7 – (ex SHTM 2025 Plan 5b): two-corridor conventional operating suite with “lay-up” prep

Note: This layout and data is for historical purposes only. The information is to be used for the evaluation of existing systems, the fitting out of existing shell schemes or rebalancing of such systems following cleaning.

Table A12 (ex SHTM 2025 Plan 5b): two-corridor conventional operating suite with “lay-up”

prep design criteria

Room Size Air-change

Nominal pressure

Flow rate (m3/s)

rate (ac/h)

(Pa)

Theatre * See Notes below ≥22 25 # See Notes below

Anaesthetic * See Notes below

Design 15

15

Commissioned ≥10

~ Supply and extract to achieve the air change rate

Lay-up prep * See Notes below ≥22 35 0.35**

Scrub * See Notes below – 25 –

Utility * See Notes below – 0

Notes:

* Existing theatre suite to be measured on site

[SHTM 03-01 Part A – PDF page 184]

# Theatre total airflow related to volume of theatre to give ≥22 ac/h or door protection = primary theatre supply + 0.28 m3/s from Lay-up Prep pressure stabiliser

** See the “designers’ notes” in Appendices 4 and 5

The utility design figures will remain the same if a hatch is fitted instead of a door onto the service corridor. Alternatively, if the operating department has a central waste processing station, the utility room may be omitted and replaced with a hatch between the theatre and service corridor.

The extracts within the theatre and scrub may be either passive and fitted with pressure stabilisers or active and connected to the extract system. They should where possible be located at low level and positioned to promote the active ventilation and scouring of all areas of the space (see paragraph 8.92). Air transfer from theatre to anaesthetic room may be by pressure stabiliser or transfer grilles (see paragraphs A8.51 and A8.52 in Appendix 8). The anaesthetic room extract will be at low level (see Appendix 9).

Figure A12 (ex SHTM 2025 Plan 5b): two-corridor conventional operating suite with “lay-up”

prep schematic layout

Standard layout 8 – (ex SHTM 2025 Plan 5a): two-corridor UCV operating suite with SPS prep

Note: This layout and data is for historical purposes only. The information is to be used for the evaluation of existing systems, the fitting out of existing shell schemes or rebalancing of such systems following cleaning. If difficulties are experienced with entrainment around the periphery of the UCV, adding a low-level active or passive extract in the location indicated will usually resolve the problem.

[SHTM 03-01 Part A – PDF page 185]

Table A13 (ex SHTM 2025 Plan 5a): two-corridor UCV operating suite with SPS prep design

criteria

Room Size Air-change

Nominal pressure

Flow rate (m3/s)

rate (ac/h)

(Pa)

Theatre * See Notes below

≥22 25 # See Notes below Anaesthetic * See Notes below

15 Design 15 Commissioned ≥10

10 25

~ Supply and extract to achieve the air change rate Sterile pack store prep

* See Notes below

– 25 –

Scrub * See Notes below

– 0

Utility * See Notes below

Notes:

* Existing theatre suite to be measured on site

# Primary fresh supply air for the UCV canopy is related to volume of theatre to give ≥22 ac/h or door protection

The utility design figures will remain the same if a hatch is fitted instead of a door onto the service corridor. Alternatively, if the operating department has a central waste processing station, the utility room may be omitted and replaced with a hatch between the theatre and service corridor.

The extracts within the theatre and scrub may be either passive and fitted with pressure stabilisers or active and connected to the extract system. They should where possible be located at low level and positioned to promote the active ventilation and scouring of all areas of the space (see paragraph 8.92). Air transfer from theatre to anaesthetic room may be by pressure stabiliser or transfer grilles (see paragraphs A8.51 and A8.52 in Appendix 8). The anaesthetic room extract will be at low level (see Appendix 9).

[SHTM 03-01 Part A – PDF page 186]

Figure A13 (ex SHTM 2025 Plan 5a): two-corridor UCV operating suite with SPS prep schematic

layout