[SHFN 30 Part A – PDF page 25]

however, that under-usage of basins encourages colonisation with Legionella and other microorganisms. Whilst there should be sufficient hand wash stations for hand washing, the provision of more than is necessary presents an avoidable risk of infection from water. Advice on number and location of hand wash stations in clinical areas should be sought from the IP&CT.

Note: Outlets that are used infrequently are a potential problem with water stagnation in all clinical areas. Measures to control the spread of microorganisms in healthcare premises include the regular use of alcohol-based hand-rubs, and this can result in a significant reduction in the use of hand-wash basins. There has also been a trend to providing an enhanced provision of hand wash basins resulting in reduced throughput of water to each. Under-use of taps encourages colonisation with Legionella and other microorganisms such as Pseudomonas spp. Designers should be aware of these issues and, accordingly, consider how they might impact on the frequency of use of hand washing.

NHS Boards should have policies in place to avoid contamination of the delivery system and ensure that clinical wash-hand basins are not used for other purposes such as emptying of patient bathing water into the water delivery system where they can colonise existing biofilms.

HBN 00-03 ‘Clinical and clinical support spaces’ and HBN 00-02 ‘Sanitary spaces’ give guidance on activity spaces required for clinical wash-hand basins including in primary care and out-patient settings, where clinical procedures or examination of patients/clients are undertaken. A clinical wash-hand basin should be accessible to where the procedure is carried out.

General wash-hand basins

All en-suite facilities should have a wash-hand basin for use by patients.

All toilet facilities should have a wash-hand basin. Wash-hand basins should not have overflows as these are difficult to clean and become contaminated.

Taps should not be aligned to run directly into the drain aperture.

All general wash-hand basins should be sealed to a seamless waterproof splash-back.

HBN 00-02: ‘Sanitary spaces’ gives guidance on activity spaces for en-suites, showers, baths and changing facilities.

SHTM 64 gives details of sanitary assemblies for other areas such as theatre scrubs, kitchens etc.

Note: For guidance on mental health and learning disability settings, see Appendix 3.

[SHFN 30 Part A – PDF page 26]

Water/taps

Health and Safety regulations (The Workplace (Health, Safety and Welfare) Regulations, 1992) require that both hot and cold running water should be available in areas where employees are expected to wash their hands.

Hands should always be washed under running water; mixer taps allow this to be practised in safety in healthcare settings where hot water temperatures may be high to control Legionella spp. (see Scottish Health Technical Memorandum 04-01).

Taps can be fitted with thermostatic mixing valves (TMVs) to ensure that the temperature of the water delivered does not cause scalding etc (no greater than 41C). TMVs are recommended in most healthcare settings depending upon outcomes of local risk assessments. TMVs should be sited within the tap or on pipework immediately prior to the taps. Taps should be capable of accommodating point-of-use filters which may have to be retro-fitted at some time following an outbreak of Legionellosis or Pseudomonas infection. (Scottish Health Technical Memorandum 04-01 refers).

There have been multiple observations of TMV colonisation with Pseudomonas spp. including Pseudomonas aeruginosa particularly in older TMVs. This observation includes colonisation with multiple antibiotic-resistant strains. This is most significant in high dependency units (for example, intensive therapy units, special care baby units, and burns units) where patients may be particularly susceptible to colonisation and infection with this opportunist pathogen. Conventional manual mixer taps may not be as prone to such colonisation and may be appropriate in situations where monitored patients are confined to their beds and consequently there may be under-usage at these outlets.

Consideration should be given to the provision of removable, accessible, TMVs and/or taps or taps with removable spouts in high dependency accommodation. By holding a float of spares, decontamination could be undertaken without prolonged interruption to hot and cold water supplies.

A local risk assessment of patient susceptibility to Pseudomonas infection versus scald risk where patients operate taps could be used to inform the use of TMVs or conventional manual mixer taps.

Non-TMV taps are also available for certain applications (for example, kitchens and cleaners’ sinks). These taps allow the user free rein to determine the temperature of the water delivered at the point of use. However, a local risk assessment should be undertaken first.

Taps should be easy to turn on and off without contaminating the hands and be elbow/wrist operated or sensor operated.

Taps discharging directly into a drain hole can cause splashing, which could disperse contaminated droplets. The tap outlet flow should not discharge directly into the waste aperture.

[SHFN 30 Part A – PDF page 27]

Swan-neck tap outlets are not recommended for new build projects nor in refurbishment schemes, as they do not fully empty after use. Strainers, aerators (flow straighteners) and anti-splash fittings at outlets are recommended not to be used as they become colonised with bacteria. Adjustments to flow may be required to minimise splash risks. Careful consideration as to the appropriateness should be given to the need to provide sensor taps in clinical wash hand basins.

Where water systems are closed down, a Legionella risk assessment should be undertaken. This should include the risk bacterial overgrowth in dead-legs poses to adjacent water systems. Flushing and hyperchlorination should also be considered when the system is reinstated.

Alcohol based hand rub/Soap dispensers

Liquid soap dispensers should be wall-mounted at all wash-hand basins and be designed to be operated without contamination from the user’s hands coming into direct contact with the dispensing mechanism. Dispensers should not be refillable but be of a disposable, single cartridge design (see Appendix 3 for guidance on mental health units).

Alcohol based hand rub dispensers should be available to staff as near to each individual patient as possible, subject to local risk assessment. Users and IPC teams should liaise and advise on the precise position and number of these units in clinical areas (Further information can be found in CNO (2005)1).

Hand drying

Paper hand-towel dispensers should be conveniently placed by all wash-hand basins (clinical and non clinical).

The use of paper towels in rolls should be discouraged. They are difficult to tear off without contaminating the remaining roll.

Fabric towels are a source of cross-contamination and must not be used for hand hygiene.

Hot-air hand dryers reduce paper waste and may be considered for use in public areas of healthcare facilities. Many machines dry hands more slowly than paper towels, and these should not be installed for staff use in clinical areas. They are noisy and should not be used in clinical areas where patients could be disturbed.

Hands-free waste bins, sack holders or receptacles, with appropriate colour- coded waste bags, should be provided by each wash-hand basin.

Sinks and slop-hoppers

Using sinks for both hand-washing and the cleaning of equipment is not allowed as this will significantly increase the risk of hand and environmental contamination. Dirty utility rooms should contain:

[SHFN 30 Part A – PDF page 28]

 a hopper;

 a macerator;

 a separate sink for cleaning equipment;

 a clinical wash-hand basin;

 space to accommodate colour-coded disposal bags for bagging waste.

Convenient access to these is important, as contaminated fluids such as patients’ wash-water should not be emptied down clinical wash-hand basins in adjacent ward areas.

Note: Equipment for destruction of disposable bedpans or cleansing non- disposable bedpans may generate significant noise. Care should be taken to eliminate this spreading to adjacent accommodation.

Slop-hoppers should be provided in areas where dirty waste water, is disposed, e.g. domestic services room, cleaners’ cupboards/areas for cleaning equipment. Hoppers should be provided in dirty utility rooms where required for the disposal of small amounts of liquid waste e.g. from urinalysis. (Further detail is provided in HBN 00-03 Clinical and clinical support spaces).

Soft furnishings

Soft furnishing used within clinical areas should be chosen for ease of cleaning and compatibility with detergents and disinfectants. They should be covered with material that is impermeable, preferably seam-free or heat-sealed.

Curtains and blinds

Privacy curtains become contaminated with micro-organisms which can be transmitted to staff hands. Where patients may be particularly susceptible to infection, curtains should have fittings that allow quick and convenient replacement. Consideration should be given to disposable curtains for which such fittings are common.

In new-build or refurbished augmented care units, consideration should be given to having separate curtains for each multi-bed space sufficiently separated such that staff can easily and correctly identify which curtain belongs to which bed space.

Reusable curtains should be able to withstand decontamination in healthcare laundering processes.

There should be a local policy on the changing of privacy curtains both for routine changing when the curtains become soiled and after discharge of a patient with a known or suspected infection. The policy for changing of privacy curtains both for routine changing when the curtains become soiled and after discharge of a patient with a known or suspected infection should reflect the practice set out in the National Cleaning Services Specification.

[SHFN 30 Part A – PDF page 29]

Window blinds are not recommended in clinical areas for new-build or refurbishment applications but where currently in place they require to be readily and regularly cleaned as part of local policy.

Equipment

The purchase of fixed equipment (Group 1&2) will normally take place before the operational commissioning period. (A full definition of Group 1&2 equipment can be accessed in Appendix 1).However, it is important during the design, construction and equipment scheduling stages that there is consultation with the Infection Prevention and Control Team in discussion of equipment. Some of this will be purchased/fitted by the Contractor and may have significant design implications. All equipment must be compatible with the need for prevention and control of infection and all equipment must be compliant with decontamination guidance.

Technical commissioning of the building, services and equipment should include any areas that require inspection and testing to demonstrate compliance with prevention and control of infection standards, i.e. theatres, hydrotherapy pools, isolation/segregation rooms and clean rooms in pharmacy and Central Decontamination Units (CDUs). There is a legal requirement for compliance in CDUs and pharmacies.

Procurement Stages

Infection Prevention and Control Expertise in Procurement activities

Infection Prevention and Control Specialist input is essential at the procurement stage of any construction/refurbishment project. This input is initially required when consideration is being given to the selection of Architects and Designers following interview.

Tender/contract

The Project Manager should seek the views of the Project Team as part of the tender evaluation process and scoring of relevant sections of tenders/contracts to assess competence in relation to the technical nature of the build.

Health & Safety expertise

Prevention and Control of HAI is a Health and Safety concern and the actions or omissions of those involved in the provision or operation of the facility could become evidence in any legal action stemming from an infection. For this reason it is essential that, as with other considerations of professional competence, all those involved in the design and planning are able to demonstrate that appropriate expertise was in place and advice sought.

Legislative issues

Before any work commences, there is a need to be aware of all legislative issues, which apply to the project. Examples of relevant legislation may include

[SHFN 30 Part A – PDF page 30]

 The Health and Safety at Work etc Act 1974;

 The Construction (Design and Management) Regulations 2007 (CDM);

 The Provision and Use of Work Equipment Regulations (PUWER) 1998;

 The Control of Substances Hazardous to Health (COSHH) Regulations

2002.

An expanded list appears in the References section of this document.

Delivering a safe environment

A number of pieces of legislation put the primary responsibility for the safety of the facility, including HAI, on the employer, usually the NHS Board. In construction procurement the ‘employer’ sets the resource, assesses the competence of the Design Team and evaluates the output. This means the employer should lead on setting the quality culture that will deliver a safe environment.

Delivery/Construction Stages

HAI-SCRIBE provides additional information on infection prevention and control.

Construction (new build)

When the project is a new-build, the largest risk is at the beginning of the project where there may be excavations of large amounts of soil together with its transportation away from the site. NHS Project Managers should visit the site at appropriate and mutually convenient times, as soon as possible after the Contractor has taken ownership of the site, meeting with the Contractor and observing work practice and familiarising themselves with the layout of the various departments. This will help them to detect any unidentified problems or ones caused by design changes. Any changes identified should be risk assessed in compliance with the Management of Health and Safety at Work and recorded.

Construction (new-build attached to existing site or refurbishment)

Involvement of Project Teams in refurbishment projects is important not only for ensuring that ‘designed-in’ prevention and control of infection is achieved, but also for assessing the potential risks to patients in existing buildings from dust, dirt and pathogens.

Note: The Health and Safety file and method statement should be reviewed prior to handling over the site to the contractor. It should include clear indications as to how waste is transferred, controlled and the site managed. By listing the HAI control measures in the Health & Safety file or similar documents the design team will have the opportunity to evaluate the suitability of the proposed controls prior to commencing HAI-SCRIBE assessment.

Measures that limit the spread of dust, dirt and pathogens during construction may include the following:

[SHFN 30 Part A – PDF page 31]

 undertaking work in winter as the risk is lower for Aspergillus spp. and other fungal infections. Clinical teams would need to bear in mind the impact of winter bed pressures and Norovirus outbreaks when planning work over this period;

 cleaning and vacuuming areas under construction and the surrounding areas frequently;

 placing adhesive floor strips outside the door to the construction area to trap dust; these should be replaced regularly to remain effective;

 sealing windows, doors and roof-space to control dust;

 installation of temporary sealed partitions where appropriate;

 provision of barriers which should be physically robust, smooth and easy to clean;

 damp-mopping the area just outside the door to the construction area daily or more often if necessary;

 using a high-efficiency particulate air (HEPA) filtered vacuum to clean areas daily or more often if necessary eg where there is a greater risk of infection spread or a greater need for control of infection;

 transporting debris in containers with tightly fitting lids, or covering debris with a wet sheet;

 all debris should be bagged and sealed for removal at convenient times. This would reduce the risk associated with frequent travel. Follow-on cleaning of the traffic routes would be required as appropriate;

 not hauling debris through patient-care areas;

 removing debris after normal work hours through an exit restricted to the construction personnel;

 designating an entrance, a lift and a hallway that the construction workers must use outwith times that it would be used by patients, visitors or healthcare workers;

 shampooing carpets when the construction project is completed;

 commissioning hotel services regarding cleaning during construction stage.

Note: The Project Manager or delegated person should monitor the effectiveness of dust control measures and any signs of dust accumulation outwith the contained area. The frequency would be based on the risk assessment of surrounding clinical areas.

HAI-SCRIBE control measures must be clearly documented, followed and recorded. Similarly, a daily checklist is maintained as a minimum during the progress of the construction project and signed off by the designated appropriate person.

[SHFN 30 Part A – PDF page 32]

Barriers N/A

Construction signs posted for the area Yes/No

Doors properly closed and sealed Yes/No

Floor area clean, no dust tracked Yes/No

Air handling

All windows closed behind barrier Yes/No

Negative air pressure at barrier entrance Yes/No

Negative air pressure machine running Yes/No

Project area

Debris removed in covered container daily Yes/No

Waste materials in appropriate container Yes/No

Routine cleaning done on job site Yes/No

Traffic control

Restricted to construction workers and necessary staff only Yes/No

All doors and exits free of debris Yes/No

Dress code

Appropriate for the area (e.g., Theatres, CDU) Yes/No

Required to enter Yes/No

Required to leave Yes/No

Table 4: Daily construction survey

Surveillance and monitoring during renovation or construction work

Incidences of Aspergillosis and Legionellosis associated with environmental changes arising from construction and renovation work have been reported (Fournel et al 2010, Boivin et al 2012).Therefore the need for additional surveillance and environmental monitoring may be identified by the Project Team through Risk Assessment.

Where any patients may be placed at risk, it is important that an appropriate risk assessment be carried out. This would be undertaken in advance of any demolition works or disturbance/alterations to the building fabric/ventilation systems. Advice on patient groupings should be obtained from clinicians.

Since the airborne spores of Aspergillus spp. can travel significant distances, this will apply generally to all works in the immediate vicinity or within the boundary of the healthcare site. The need would be dependent on the HAI Risk classification such as type 3 or type 4. Particular care will be required in Transplant units and other accommodation for Immuno-compromised patients.

Delivery/Commissioning Stage

Upon completion of construction, the facility must be brought into use; the complexity of the task involved generally means that a Commissioning Manager and Commissioning Team will be needed. Senior managers, infection prevention and control teams, specialist teams and users should be fully involved in the process. The commissioning entails: