Home › England (NHS England estates) › HBN 00-09 › Appendix 1 – Mental health and learning disability settings / Appendix 2 – Example of a typical IPC checklist

HBN 00-09: Appendix 1 – Mental health and learning disability settings / Appendix 2 – Example of a typical IPC checklist

Infection control in the built environment · PDF pages 37–40 of 47 · Source file: HBN_00-09_infection_control.pdf
Unofficial text extract. Tables and figures may be incomplete. Authoritative version: official PDF from NHS England.

[HBN 00-09 – PDF page 37]

Appendix 1 – Mental health and learning disability settings

Note:

1. This appendix should be read in conjunction with the rest of the document.

• There is no requirement for a clinical wash- hand basin in an en-suite bedroom. Alternative arrangements to provide healthcare staff with access to hand hygiene should be made.

2. With regard to learning disability settings, this guidance applies to in-patient units only and not to domiciliary care services that provide support in people’s own homes.

• There should be sufficient access to hand- hygiene facilities for staff. Clinical wash-hand basins should be sited only in supervised areas such as the clean utility room, treatment rooms and dirty utility room. Antimicrobial hand-rub should be provided. Where necessary, the use of patient wash-hand basins in en-suite rooms can be used with care to avoid recontamination of hands.

1. The need to minimise the risk of cross-infection is important in mental health settings, but other factors such as ligature risk and the creation of a positive therapeutic environment will need to be taken into consideration when providing advice to these areas.

• In secure mental health units, hand dryers or vandal-proof integral hand-wash dryers in communal toilets may provide a safer option for hand hygiene while encouraging those in the service to clean hands.

• Single rooms can be used for source isolation.

2. The IPC requirements for those using mental health and learning disability environments must be made in conjunction with health and safety teams, risk management teams and clinicians when advising on the built environment. Specific design guidance for mental health units (Health Building Note 03-01 – ‘Adult acute mental health units’) and medium secure services (DH’s ‘Environmental design guide: adult medium secure services’) should also be consulted. For dementia settings, additional considerations are discussed in the ‘Dementia Design Checklist’ (Health Facilities Scotland, 2007).

• Risk assessment should inform the storage of protective clothing, soap and paper towels, clinical waste receptacles etc. All fixtures and fittings should be anti-ligature (see Health Building Note 03-01 – ‘Adult acute mental health units’).

Recommendations:

• Assessment of the need for a macerator or bedpan washer-disinfector should be undertaken. If a specific dirty utility room is not required, alternative procedures should be in place for the disposal of body fluids and urine testing.

• Creating/maintaining a non-clinical feel can be achieved by using furnishings/fittings that are manufactured especially for this setting and are easy to clean and maintain. For example, wood- effect vinyl can be used to create a less clinical environment, but cleanliness can be maintained. Vinyl is easy to maintain and requires less frequent replacement.

• DH’s ‘Environmental design guide: adult medium secure services’ advises on appropriate floor coverings to reduce risk of harm.

• In some specialties within mental health bedroom areas, porcelain basins and toilets would present a risk; alternatives such as resin or stainless steel should be considered. Cleaning of these materials should, however, be considered carefully.

[HBN 00-09 – PDF page 38]

Appendix 2 – IPC checklist: good practice example

Appendix 2 – Example of a typical IPC checklist

Date:

Business case review

For non-clinical issues related to the design, construction and fitting out of multi-bed rooms and associated areas

To be completed by the healthcare provider

Healthcare provider

Site

Project/scheme

Building/ward

Project manager for the healthcare

provider

Business case or design stage to

which this checklist/review applies

Completed by (for healthcare

provider) Date:

Reviewed by Date:

General notes

[HBN 00-09 – PDF page 39]

To ensure that all departments/commissioners

are satisfied with the IPC issues for the

facilities proposed. The person ultimately

responsible.

The provision of coordination, advice and

management across clinical boundaries and to

inform the trust board/management team.

The provision of coordination, advice

and management across the estates and

facilities team and to inform the trust board/

management team

To provide specialist input into the design and

management process to facilitate effective IPC

performance.

Working with the maintenance manager,

current and anticipated problems should be

designed out of the new/refurbished facility.

As above.

Nursing/local input is essential as the nursing

staff are ultimately those using the facility.

Their buy-in as a stakeholder in direct patient

care is very important.

One of the prime causes of poor cleaning is

clutter and poor storage facilities.

infection and privacy and dignity issues

of the facilities to be provided by his/her

organisation to patients, staff and visitors.

With regard to IPC of the facilities and

resources to be provided by his/her

organisation to patients, staff and visitors.

maintenance of the buildings and resources

to be provided by his/her organisation in

order to ensure a safe estate is provided for

patients, staff and visitors.

signing-off process and that the design is to

their satisfaction for IPC purposes.

approved with respect to the potential for

effective and efficient cleaning and that

sufficient resources are/will be available.

is approved with respect to the potential

for effective and efficient maintenance to

promote and maintain effective and efficient

cleaning.

operation of the facility or ward can be run

and managed in an efficient and hygienic

manner.

provided for equipment is adequate and is

suitable.

Check Reason Involvement Design signed-off by:

Chief executive officer With regard to control and prevention of

Director of infection

prevention and control

(DIPC)

Director of Estates &

Facilities With regard to design, operation and

IPC team manager To ensure involvement in the design and

Facilities manager To ensure that the design and detailing is

Maintenance manager To ensure that the design and detailing

Ward/nurse manager/

matron To ensure that the physical design and the

Equipping manager To ensure that storage facilities and space

Part 1. Sign-off

The infection prevention and control checklist/review should be signed off by the relevant parties before the scheme proceeds.

Some of the roles below (not chief executive officer) may be covered by a relevant director in the healthcare provider organisation. If

appropriate, a single sign-off, clearly stating which areas of responsibility are covered, may suffice.

[HBN 00-09 – PDF page 40]

Appendix 2 – IPC checklist: good practice example

A risk assessment should be used to inform

decisions regarding which patients to nurse in

single-bed rooms. Healthcare providers should

audit the use of en-suite single-bed rooms to

determine where further local requirements and

adaptations are greatest.

Protecting immunocompromised patients from

airborne fungal infection.

Prevent interference with specialist ventilation

systems, e.g. if work is adjacent to an operating

theatre or isolation room.

To minimise and manage risk. See issues below.

planning taken into account

the implications on existing

patients and staff? IPC is an

area that may not feature in

the usual risk assessments

undertaken.

prevent the spread of

infection between patients,

visitors and staff by control or

containment of potentially

To assist in designing-out all

IPC-related risks. See issues below.

* Has the design and project

Check * Reason Possible issues to consider Y/N Comments on scheme

Check * Reason Possible issues to consider Y/N Comments on scheme

Healthcare organisations will each have their own specific design and build issues to consider.

They should use the guidance in this document to develop bespoke IPC checklists for sign-off by

the relevant parties.

Isolation facilites The primary aim of IPC is to

and control risk assessment

been completed in relation

to the completed facility as

proposed?

and control risk assessment

been completed in relation

to the construction

refurbishment of the

healthcare facility?

constructed in the vicinity

of existing patients and

staff such as within the

existing ward or building or

immediately adjacent to the

existing building?

Has an infection prevention

Will the new facility be

Has an infection prevention

*

Part 2. Design

Part 3. Management of the construction of the new facility (including demolition and enabling

works)