SHTM 81 part 1: 19. Assembly points / 20. Heating ventilation & air conditioning systems (HVAC)
[SHTM 81 part 1 – PDF page 29]
19. Assembly points
Consideration should be given, at the design stage, regarding the siting of external assembly points.
External routes and assembly points should:
be located where persons will not be endangered by traffic or other hazards;
be sited where access for ambulances and fire appliances is not compromised;
have adequate signage and lighting;
have paved footpaths;
have dropped kerbs where crossing roads;
not have excessive gradients;
be located at sufficient distance from the building, i.e. a ‘place of safety’.
[SHTM 81 part 1 – PDF page 30]
20. Heating ventilation & air conditioning systems (HVAC)
HVAC systems provide a safe and comfortable environment for occupants. The systems provide a positive or negative air pressure to protect patient treatment areas such as operating departments, intensive therapy units and isolation suites. They also ensure the correct air quality for pharmacies, laboratories and sterile supply departments.
HVAC systems should be installed in accordance with SHTM 03-01.
The ventilation system should continue to operate normally in areas not affected by fire, thereby maintaining infection control measures, and allowing patient treatment to continue.
In some instances, when a fire develops, it may be necessary to shut down the complete system, therefore, the facility should be provided with a shut down and start up control that should only be operated under the instruction of the fire service.
The HVAC control panel should be located at a department entrance or adjacent to the main fire alarm indicator panel.
HVAC ductwork
In the event of a fire, there is a potential for large quantities of smoke and toxic gases to spread through ventilation ductwork to rooms and areas remote from the fire. Therefore, measures are required to:
prevent fire from entering or leaving ductwork;
limit the spread of smoke and other products of combustion within ductwork;
maintain the integrity of walls, floors or ceilings (attached to the roof structure), where they are penetrated by ductwork.
Ductwork passing through a compartment, sub-compartment, cavity barrier or fire resisting construction protecting escape routes (including corridors serving sleeping accommodation) should be provided with remotely resettable fire and smoke dampers actuated by automatic smoke detection.
Where ductwork passes through bedrooms that are not classified as high hazard rooms, there is a requirement to limit the spread of smoke and other products of combustion to ensure a safe and manageable evacuation from rooms adjacent to a room on fire. Therefore, remotely resettable fire and smoke dampers should be fitted to ductwork at intervals not exceeding eight bedroom clusters.
However, ductwork passing through a compartment, sub-compartment, cavity barrier or fire resisting construction protecting escape routes (including corridors serving sleeping accommodation) that does not have any intakes or extracts may be constructed of fire and smoke resistant material or sited within a fire and smoke resisting enclosure.
[SHTM 81 part 1 – PDF page 31]
Where ductwork penetrates any compartment wall, floor or ceiling (attached to the roof structure), it should be fire and smoke stopped to ensure that it maintains at least the same level of fire resistance as the surrounding structure. See section 21.