Home › England (NHS England estates) › HTM 05-02 › Appendix G: Fire drawings

HTM 05-02: Appendix G: Fire drawings

Firecode - Guidance in support of functional provisions (Fire safety in the design of healthcare premises) · PDF pages 97–98 of 112 · Source file: HTM_05-02_2015.pdf
Unofficial text extract. Tables and figures may be incomplete. Authoritative version: official PDF from NHS England.

[HTM 05-02 – PDF page 97]

Appendix G: Fire drawings

Provision of drawings

f. any smoke-control system(s) (or ventilation system with a smoke-control function), including mode of operation, control systems and inlet air routes, and fire-and-smoke damper locations and HVAC routing;

g. any high-risk areas (for example heating

machinery);

h. specifications of any fire safety

The following information should be provided as drawings to assist the responsible persons to operate, maintain and use the building in reasonable safety and to assist the eventual owner, occupier and/or employer to meet their statutory duties under the Regulatory Reform (Fire Safety) Order. This is considered best practice to comply with regulation 38 of the Building Regulations.

equipment provided, in particular any routine maintenance schedules; and

An as-built plan of the building should be provided showing:

a. escape routes;

i. any assumptions in the design of the fire safety arrangements regarding the management of the building.

b. compartmentation and separation (that

Fire drawings

is, location of fire-separating elements including cavity barriers in walk-in spaces);

c. fire doors, self-closing fire doors and

To adequately assess the fire precautions at design stage, a set of fire drawings should be prepared using symbols based on BS 1635.

other doors equipped with relevant hardware (for example panic locks);

d. locations of fire and/or smoke detector

In order to adequately assess compliance with the requirements of this guidance, the drawings should show in sufficient detail the detection and alarm systems, the means of escape, the structural fire precautions, the portable and fixed fire-fighting equipment, smoke control/ ventilation arrangements, and access and facilities for the fire-and-rescue service.

heads, alarm call-points, detection/alarm control boxes, alarm sounders, alarm zones and Cause and Effect, fire safety signage, emergency lighting, fire extinguishers, dry or wet risers and other fire-fighting equipment, and location of hydrants outside the building;

A typical set of fire drawings would comprise:

e. any sprinkler system(s), including

a. a location plan;

isolating valves and control equipment;

b. a site plan;

[HTM 05-02 – PDF page 98]

c. a floor plan of each storey, prepared at a

scale of not less than 1:200;

completion, an as-built set of drawings can be prepared.

d. a floor plan of each department,

prepared at a scale of not less than 1:100 and preferably at a scale of 1:50; and

e. a set of elevations.

The as-built drawings should be held by the trust so that any proposed future alterations can be checked against the fire drawings to ensure that the integrity of fire safety is maintained in accordance with the recommendations in this document.

This is an operational requirement and cannot be enforced through the current Building Regulations.

During the construction of a project, variations to the structure and the layout frequently occur; these variations should not subvert the integrity of the agreed fire precautions. The variations should be recorded on the fire plans so that on