HTM 05-02: 1. Introduction
[HTM 05-02 – PDF page 17]
1. Introduction
General application
A full definition of services is contained in Appendix H.
1.3 HTM 05-02 should be used in the design of:
a. new healthcare buildings;
1.1 This Health Technical Memorandum provides recommendations and guidance on the design of fire safety in healthcare premises. It supersedes HTM 05-02 – ‘Guidance in support of functional provisions for healthcare premises’, published in January 2007.
b. new extensions to existing healthcare
buildings;
c. those parts of existing healthcare
1.2 The guidance in this document is applicable to premises regulated by the Care Quality Commission (CQC), irrespective of ownership, that provide the following types of service:
buildings that are used as means of escape from a new healthcare extension;
CQC Code Service type
d. alterations to existing healthcare
ACS Acute services
buildings;
e. change of use of an existing building,
HBC Hyperbaric chamber services
or parts of an existing building, to healthcare use.
HPS Hospice services
LTC Long-term condition services
Please note: paragraphs 1.3d and 1.3e apply irrespective of whether the alterations and change of use constitute “building work” as defined by the Building Regulations 2010.
MLS Hospital services for people with mental health needs, and/or learning disabilities, and/or problems with substance misuse
Building Regulations
RHS Rehabilitation services
RSM Residential substance misuse and treatment/rehabilitation services
DTS Doctors’ treatment services
DSS Diagnostic and/or screening services
1.4 The purpose of this document is to provide guidance on the minimum standards of fire safety expected in healthcare premises to comply with Part B of Schedule 1 of the Building Regulations 2010. It is a guidance document that recognises the problems special to healthcare and allows the current statutory regulations to be applied sensibly within a framework of understanding. To that end, the following functional provisions are expected to be met:
UCS Urgent care services
[HTM 05-02 – PDF page 18]
appropriate to the needs of the relevant persons in the building and their levels of dependency; additional guidance is provided in paragraphs 2.33–2.36.
• B1: To ensure satisfactory provision of means of giving an alarm of fire and a satisfactory standard of means of escape for persons in the event of fire in a building (Chapter 3).
BS 5588
• B2: To ensure fire spread over the internal linings of buildings is inhibited (Chapter 4).
1.7 HTM 05-02 refers to the guidance contained in parts of the BS 5588 series of standards as a means of showing compliance with the requirements of Part B (Fire safety) of Schedule 1 to the Building Regulations. In doing so the Department of Health follows the practice adopted by the Department of Communities and Local Government (DCLG) in relation to Approved Document B and references to BS 5588 remain part of HTM 05- 02 until such time that it is next revised.
• B3: To ensure the stability of buildings in the event of fire; to ensure that there is a sufficient degree of fire separation within buildings and between adjoining buildings; to provide automatic fire suppression where necessary; and to inhibit the unseen spread of fire and smoke in concealed spaces in buildings (Chapter 5).
• B4: To ensure external walls and roofs have adequate resistance to the spread of fire over the external envelope, and that spread of fire from one building to another is restricted (Chapter 6).
1.8 Where designers elect to follow the relevant guidance in BS 9999 they will need to satisfy themselves and the building control body that this guidance adequately addresses the requirements of Part B. It is strongly recommended that in such cases designers discuss their proposals with the building control body before starting work.
• B5: To ensure satisfactory access for fire appliances to buildings and the provision of facilities in buildings to assist fire fighters in the saving of life of people in and around buildings (Chapter 7).
1.9 Withdrawn BS standards are readily available from:
The BSI Knowledge Centre British Standards Institution 389 Chiswick High Road London, W4 4AL Email: knowledgecentre@bsigroup.com Tel: +44 (0)20 8996 7004
Fire safety information
1.5 Health Technical Memorandum 05-02 should be used as guidance on fire safety in all parts of healthcare buildings, classed as Purpose Group 2a – Residential (Institutional),1 including departments or areas providing ancillary services which are planned as an integral part of a healthcare building. The guidance it contains follows the structure of the requirements set out in Part B Schedule 1 of the Building Regulations.
1.6 Some of the premises listed in paragraph 1.2 above may be classed as Purpose Group 5 – Assembly and Recreation; for these premises the application of HTM 05-02 should be limited to those measures necessary to provide a safe patient environment for the time necessary to effect an evacuation. Such measures should be
1.10 Regulation 38 of the Building Regulations requires that where building work is carried out that affects fire safety, and where the building affected will be covered by the Fire Safety Order, the person carrying out the work must provide sufficient information for persons to operate and maintain the building in reasonable safety. This information will assist the eventual owner/occupier/employer to meet their statutory duties under the Fire Safety Order. The exact
1 As defined in Approved Document B
[HTM 05-02 – PDF page 19]
1. Introduction
this document will be safe: it needs to be supported by a fully developed emergency plan. This is also a legal requirement imposed by the Fire Safety Order.
amount of information and level of detail necessary will vary depending on the nature and complexity of the building’s design. Further guidance is provided in paragraphs 1.13–1.19 below.
1.11 For all healthcare premises covered by the guidance in this document a detailed record of the fire safety strategy, evacuation procedures, patient dependency and staffing levels, together with information on the operation and maintenance of any fire protection measures of the building, will be required.
1.12 Guidance on the application of the Fire Safety Order to healthcare premises is provided in HTM 05-01.
1.16 The preparation of the emergency evacuation plan commences during the design phase and should be developed through the user consultation process. It is important to stress that in relation to the design of appropriate fire precautions, each type of clinical service will present its own unique set of problems which will only fully emerge during the design phase. It is therefore essential that architects and designers, through the client user group consultation process, fully understand and record the fire safety issues associated with the clinical service being provided and the patients being treated.
Consultation and qualitative design review
1.17 The fire safety measures and the emergency evacuation strategy should be developed and agreed through discussions with:
a. Client user group – generally involving
clinicians, nurses, managers, the fire safety advisor and the local security management specialist;
b. Design team – architects and engineers;
c. Fire service representative; and
d. Building control or approved inspector.
1.13 Health Technical Memorandum 05-02 has been written on the assumption that the premises will be properly managed. Building Regulations do not impose any requirement on the management of a building; however, in developing an appropriate fire safety design for healthcare premises it is essential to consider the way in which it will be managed, as fire safety in healthcare premises relies on well- trained staff to implement a pre-agreed emergency plan; this is especially important where care is provided for dependent or very high dependency patients.
1.14 A design that relies on an unrealistic or unsustainable management regime cannot be considered to have met the requirements of the Building Regulations.
1.18 For very large and complex projects, it is recommended that a Qualitative Design Review (QDR), as detailed in PD 7974-0:2002, be carried out by a study team involving one or more fire safety engineers, other members of the design team and the client user group. It might also be appropriate to include representatives of approval bodies or the insurers to ensure that their views can be accounted for. Further guidance on the application of QDR to healthcare premises is contained in Appendix J.
1.15 It is therefore essential that the design team have a full understanding of the type of care being provided and the dependency of the patients, and that the client team fully appreciate the constraints imposed by the design on the movement and evacuation of patients, visitors and staff. The design team and approving authorities should not assume that a design which complies with the requirements in
[HTM 05-02 – PDF page 20]
(v) smoke-control system(s) (or HVAC
1.19 The outcome of these discussions will be all the information required to support Regulation 38 and should include:
system with a smoke-control function) design, including mode of operation and control systems;
a. the emergency evacuation plan
e. any high-risk areas (for example heating
including all assumptions in relation to:
machinery) and particular hazards;
(i) the availability of adequately trained
staff to manage an evacuation;
f. as-built plans of the building showing the locations of the above;
(ii) the design of the fire safety
g. specifications of any fire safety
systems (such as fire load);
(iii) any risk assessments or risk
analysis;
b. all assumptions in the design of the fire
equipment provided, including operational details, operator manuals, software, system zoning, routine inspection, and testing and maintenance schedules, together with records of any acceptance or commissioning tests;
safety arrangements regarding the management of the building;
h. any other details appropriate for the
c. escape routes (including stairs and
specific building; and
lifts), escape strategy (for example simultaneous or phased) and muster points;
i. for large and/or complex premises, the findings of the QDR.
d. details of all fire safety measures,
including (but not exhaustively):
Alternative solutions
(i) compartmentation, cavity barriers,
fire doors, self-closing fire doors and other doors equipped with relevant hardware (for example electronic security locks), and fire and smoke dampers;
(ii) automatic fire detection systems,
1.20 The range of NHS premises providing patient care facilities is extensive, and the guidance in this document may not be appropriate for all types of building. However, it is expected that NHS clients, designers, building control and fire authorities will exercise a degree of judgement based on a full understanding of the problem, taking into account the full implications of the dependency and medical conditions of the patients being treated.
emergency communication systems, CCTV, fire safety signage, emergency lighting, fire extinguishers;
(iii) dry or wet risers and other fire-
fighting equipment, other interior facilities for the fire-and-rescue service, emergency control rooms, location of hydrants outside the building, and other exterior facilities for the fire-and-rescue service;
(iv) sprinkler system(s) design,
including isolating valves and control equipment; and
1.21 This document describes a way of achieving an acceptable standard of fire safety within new and modified healthcare buildings, but it is recognised that there may be other ways of satisfying the functional requirements by adopting a fire safety engineering approach. A fire safety engineering approach that takes into account the total fire safety package can provide an alternative approach to fire safety. If such an approach is used, the responsibility is placed upon those promoting the alternative approach to demonstrate that the alternative
[HTM 05-02 – PDF page 21]
1. Introduction
satisfies the functional requirements and fire safety objectives of this document.
Use by competent persons
conduct of contractors should be adequately supervised and controlled. Adequate precautions against fire should be in place, and regular contact with contractors should be maintained to ensure that local fire safety policies are being complied with.
1.22 The guidance in this document has been prepared on the understanding that it will be used by competent persons. For the purposes of this document, a competent person is defined as a person recognised as having sufficient technical training and actual experience, or technical knowledge and other qualities, both to understand fully the dangers involved, and to undertake properly the statutory and Firecode provisions referred to in this Health Technical Memorandum.
1.26 It is also important to ensure that – when new buildings are being constructed and handed over in phases – due consideration is given to fire safety after handover. There must be no conflict in the operation of the alarm and detection system between the healthcare- occupied part of the premises and the construction area. Of equal importance is the need to ensure that means of escape is readily available at all times.
Certification schemes
Relationship with Construction (Design and Management) Regulations 2015
1.27 There are many UK product certification schemes. Such schemes certify compliance with the requirements of a recognised document which is appropriate to the purpose for which the material is used. Materials that are not certified may still conform to a relevant standard.
1.23 The purpose of this document is to provide guidance on the fire safety requirements for the completed building. It does not address the risk of fire during the construction work, which is covered by the Construction (Design and Management) Regulations 2015 and the Fire Safety Order. The Health and Safety Executive (HSE) has issued HSG 168: ‘Fire safety in construction work’ (ISBN: 0 71761 332 1), which provides relevant guidance on fire safety in construction.
1.28 Many certification bodies which approve such schemes are accredited by United Kingdom Accreditation Service (UKAS). Since the fire performance of a product, component or structure is dependent upon satisfactory site installation and maintenance, independent schemes of certification and accreditation of installers and maintenance firms can offer confidence in the standard of workmanship provided.
1.24 When the construction work is being carried out on an occupied building, the Fire and Rescue Authority is responsible for the enforcement of the 2005 Regulations in those parts which remain occupied.
Fire safety during building operations
1.29 Schemes such as those identified above may be accepted by building control bodies as evidence of compliance; however, a building control body may want to establish before work commences that the scheme is adequate for approval purposes.
1.25 A significant number of fires occur as a result of certain building activities. The site